Skip to main content
CityRuleLookup

New Braunfels, TX Trash & Recycling: Dumpster Rules (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required
Building-division permit before install
Pad thickness
6-inch concrete, rebar-reinforced
Screen height
Minimum 7 feet
Gate size
12 ft wide, 180-degree swing
Storm drain setback
30 feet minimum
First-offense fine
$25-$1,000 (Sec. 110-16)

Summary

Before a dumpster goes on a commercial site in New Braunfels, the pad and enclosure have to clear the standards in Sec. 110-58: a building-division permit, a six-inch concrete pad, a screen at least seven feet high on every side facing the right-of-way or a neighboring property, and a 12-foot gate that swings a full 180 degrees.

All new container, new account holder, and service requests to change container size must first comply with the following standards for container pads and screening and must be maintained to these standards prior to collection by the city:(1)No dumpster or screening shall be permanently placed or constructed upon any site without first obtaining a permit from the building division....a.All container pads and aprons shall be constructed of concrete six inches thick....(3)Required screening, all containers are required to be screened from the right-of-way and all adjacent properties by a minimum seven-foot-high screen. A gate is required when opening is in view of the public right-of-way. Gates shall have a minimum width of 12 feet when open, shall swing 180 degrees from the closed position, and shall utilize a positive-locking mechanism while in the open position.(4)Enclosures shall not be located closer than 30 feet of any storm drain or in drainage flow areas.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 36).

Full Breakdown

Sec. 110-58 applies every time a business gets a new commercial container, opens a new solid waste account, or asks to change container size, and none of those requests move forward until the site meets the container-pad standards. A permit from the building division comes first, supported by a scaled plat showing the dumpster location, screening, utilities, storm drain inlets, and rights-of-way, signed by the property owner or the person in control of the premises. The pad itself must be concrete at least six inches thick, reinforced with number-four rebar on 18-inch centers.

Screening has to hide the container from the right-of-way and from every adjacent property behind a wall at least seven feet tall, and any gate visible from the public right-of-way must open to a full 12 feet wide, swing 180 degrees, and lock in the open position so it does not blow shut on a collection truck. The enclosure cannot sit within 30 feet of a storm drain or in a drainage flow area, and the interior dimensions scale with the number of dumpsters: a single three-, four-, six-, or eight-yard dumpster needs at least ten feet of depth by 12 feet of width inside the screen, doubling to 24 feet wide for two containers and 36 feet for three, while a roll-off compactor enclosure needs 29 feet of depth by 16 feet of width.

The approach itself needs 20 feet of unobstructed width, 65 feet of length, and a 45-foot outside turning radius so a collection truck is never required to back more than 50 feet or back directly out onto a public street; the solid waste manager can designate an alternative layout or grant exemptions where a site genuinely cannot meet these dimensions.

Violations & Fines

A container pad, screen, or enclosure that does not meet Sec. 110-58's dimensions, or a dumpster installed without the required building-division permit, can be refused service by the solid waste and recycling division until it is brought into compliance, and the underlying failure to comply with Chapter 110 is punishable under the general penalty in Sec. 110-16: $25.00 to $1,000.00 for a first offense and $150.00 to $2,000.00 for a repeat offense, each day counted separately.

Frequently Asked Questions

Do I need a permit to install a dumpster enclosure in New Braunfels?
Yes. Sec. 110-58(1) requires a building-division permit before any dumpster pad or screening is permanently placed or built, supported by a scaled plat showing the container location, screening, and nearby utilities and storm drains, signed by the property owner.
How tall does dumpster screening have to be?
At least seven feet, on every side facing the public right-of-way or an adjacent property, under Sec. 110-58(3). Any gate visible from the right-of-way must also open to a full 12-foot width and swing 180 degrees with a positive-locking mechanism.
How far from a storm drain does a dumpster enclosure have to be?
At least 30 feet, under Sec. 110-58(4), which also bars locating an enclosure in a drainage flow area. The solid waste manager can grant an exemption or designate an alternate location where a site's layout genuinely cannot meet the standard.

Sources & Official References

Other rules in New Braunfels

All New Braunfels rules

Texas rules heatmap·Compare New Braunfels to another location·View the Texas trash & recycling overview

Get notified when Dumpster Rules in New Braunfels, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.