Skip to main content
CityRuleLookup

Barrow County, GA Tree Protection: Parkway Planting (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Tree spacing
No farther than 40 feet on center
Streetlight spacing
50 feet on center, D211 planting strip
Minimum root area
200 sq ft, 3 ft soil depth
Governing section
Barrow County Code § 89-1518(g)
Where it applies
D211 Overlay; similar rule in Highway Corridor Overlay

Summary

New streets built inside Barrow County's Destination 211 (D211) Overlay District must include a planting strip with street trees spaced no farther than 40 feet apart. Barrow County Code § 89-1518(g) sets the standard, requiring each tree to have at least 200 square feet of root space and three feet of soil depth, with root guards to protect underground utilities.

These county ordinances apply to unincorporated areas of Barrow County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(3)Street trees are required in the planting zone. Street trees shall be planted no farther than 40 feet on the center and be spaced at an equal distance from required streetlights. ... (5)Each street tree in the planting zone shall have a minimum area suitable for root growth of 200 square feet or more and a suitable soil depth of three feet or more. To protect underground utility lines from tree roots, trees shall be planted at least three and one-half feet away from the back of curb, or if the road is not curbed from the edge of pavement, and durable root guards shall be installed at time of planting.

Full Breakdown

Section 89-1518 sets the county's streetscape design requirements for the D211 Overlay, covering both the Highway 211 corridor (Type A Road) and every other new street inside the district (Type B Corridors). The Streetscape Design Table pairs a six-foot-minimum planting strip with street trees spaced 40 feet on center and streetlights spaced 50 feet on center for both road types. Subsection (g) spells out the planting-strip standards in more detail: street trees are required in the planting zone and must be planted no farther than 40 feet on center, spaced evenly with the required streetlights, and each tree needs a minimum 200 square feet of root growth area and at least three feet of soil depth, with durable root guards installed at planting and a minimum three-and-a-half-foot setback from the back of curb to protect utility lines.

Trees must be selected from an approved list of overstory species, including Bald Cypress, Shumard Oak and Willow Oak, or an approved understory species when overhead utilities require a smaller tree, and must be at least three-inch caliper at planting. Property owners are responsible for replacing any required tree that dies or fails to thrive. A separate but similar rule applies to a much wider stretch of unincorporated Barrow County: Barrow County Code § 89-1605(c), part of the Highway Corridor Overlay covering SR 124, SR 11, Highway 211, Highway 53, Highway 81 and Highway 316/US 29, also requires canopy street trees in the landscaped strip along those corridors, drawn from its own large- and small-tree species lists. Outside the D211 and Highway Corridor Overlay boundaries, this record does not address whether a parkway planting requirement exists.

Violations & Fines

A developer who fails to install the required planting strip and street trees cannot obtain final plat approval or a certificate of occupancy from the Planning and Community Development Director. Because this requirement sits in the Unified Development Code, Barrow County Code § 89-1447 makes noncompliance a misdemeanor, with the magistrate court authorized to impose a civil penalty of up to $2,500.00 for each day the violation continues, on top of any stop-work order.

Frequently Asked Questions

How far apart must street trees be planted in the D211 district?
No farther than 40 feet on center, spaced at an equal distance from the required streetlights, under Barrow County Code § 89-1518(g)(3). The planting strip itself must be at least six feet wide and sits between the sidewalk and the roadway on both Highway 211 and every other new street inside the overlay.
What species of tree can satisfy the requirement?
Section 89-1518(g)(6) lists approved overstory species such as Bald Cypress, Shumard Oak, Willow Oak and Chinese Elm, plus approved understory trees like Eastern Redbud and Flowering Dogwood that can substitute when overhead utilities limit tree height. Each tree must be at least three-inch caliper at the time of planting.
Does the 40-foot spacing rule apply county-wide?
No. It applies inside the mapped D211 Overlay under Sec. 89-1518. A comparable canopy street tree requirement exists separately for the Highway Corridor Overlay along SR 124, SR 11, Highway 211, 53, 81 and 316/US 29 under Barrow County Code § 89-1605(c), but the rest of unincorporated Barrow is not addressed by either section.

Sources & Official References

Other rules in Barrow County

All Barrow County rules

Compare Barrow County to another location·View the Georgia tree protection overview

Get notified when Parkway Planting in Barrow County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.