Key Facts
- Tree spacing
- No farther than 40 feet on center
- Streetlight spacing
- 50 feet on center, D211 planting strip
- Minimum root area
- 200 sq ft, 3 ft soil depth
- Governing section
- Barrow County Code § 89-1518(g)
- Where it applies
- D211 Overlay; similar rule in Highway Corridor Overlay
Summary
New streets built inside Barrow County's Destination 211 (D211) Overlay District must include a planting strip with street trees spaced no farther than 40 feet apart. Barrow County Code § 89-1518(g) sets the standard, requiring each tree to have at least 200 square feet of root space and three feet of soil depth, with root guards to protect underground utilities.
(3)Street trees are required in the planting zone. Street trees shall be planted no farther than 40 feet on the center and be spaced at an equal distance from required streetlights. ... (5)Each street tree in the planting zone shall have a minimum area suitable for root growth of 200 square feet or more and a suitable soil depth of three feet or more. To protect underground utility lines from tree roots, trees shall be planted at least three and one-half feet away from the back of curb, or if the road is not curbed from the edge of pavement, and durable root guards shall be installed at time of planting.
Full Breakdown
Section 89-1518 sets the county's streetscape design requirements for the D211 Overlay, covering both the Highway 211 corridor (Type A Road) and every other new street inside the district (Type B Corridors). The Streetscape Design Table pairs a six-foot-minimum planting strip with street trees spaced 40 feet on center and streetlights spaced 50 feet on center for both road types. Subsection (g) spells out the planting-strip standards in more detail: street trees are required in the planting zone and must be planted no farther than 40 feet on center, spaced evenly with the required streetlights, and each tree needs a minimum 200 square feet of root growth area and at least three feet of soil depth, with durable root guards installed at planting and a minimum three-and-a-half-foot setback from the back of curb to protect utility lines.
Trees must be selected from an approved list of overstory species, including Bald Cypress, Shumard Oak and Willow Oak, or an approved understory species when overhead utilities require a smaller tree, and must be at least three-inch caliper at planting. Property owners are responsible for replacing any required tree that dies or fails to thrive. A separate but similar rule applies to a much wider stretch of unincorporated Barrow County: Barrow County Code § 89-1605(c), part of the Highway Corridor Overlay covering SR 124, SR 11, Highway 211, Highway 53, Highway 81 and Highway 316/US 29, also requires canopy street trees in the landscaped strip along those corridors, drawn from its own large- and small-tree species lists. Outside the D211 and Highway Corridor Overlay boundaries, this record does not address whether a parkway planting requirement exists.
Violations & Fines
A developer who fails to install the required planting strip and street trees cannot obtain final plat approval or a certificate of occupancy from the Planning and Community Development Director. Because this requirement sits in the Unified Development Code, Barrow County Code § 89-1447 makes noncompliance a misdemeanor, with the magistrate court authorized to impose a civil penalty of up to $2,500.00 for each day the violation continues, on top of any stop-work order.
Frequently Asked Questions
How far apart must street trees be planted in the D211 district?
What species of tree can satisfy the requirement?
Does the 40-foot spacing rule apply county-wide?
Sources & Official References
Other rules in Barrow County
Compare Barrow County to another location·View the Georgia tree protection overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.