Skip to main content
CityRuleLookup

Framingham, MA Tree Protection: Parkway Planting (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Spacing
One tree every 20-30 feet
Minimum per lot
Two street trees per lot
Caliper size
2.5 to 3 inches at planting
Certifying official
Framingham Tree Warden, DPW
CO condition
Tree Warden sign-off before occupancy
Utility screening
Shrubs at least 18 inches tall

Summary

In the City of Framingham, subdivision developers must plant a street tree every 20 to 30 feet along new roads, with at least two street trees per created lot, under City Code § 530-61. Trees must be 2.5 to three inches in caliper when planted, and the Framingham Tree Warden certifies compliance before Inspectional Services will issue a certificate of occupancy for the new lots.

B. Public landscaping. (1) All public landscaping shall be installed in accordance with best practices to ensure sustained survival of plantings. (2) The Framingham Tree Warden shall certify compliance with these regulations and the acceptance of all street tree plantings prior to the issuance of a certificate of occupancy from the Inspectional Services Division. ... (4) Subdivisions shall be designed to have a street tree planted every 20 feet to 30 feet or a minimum of two street trees per lot. (a) Street trees shall be planted on alternating sides of the sidewalk for sides of a road or way with a sidewalk. (b) Street trees shall be planted in a staggered plane adjacent to the roadway for sides of a road or way without a sidewalk. (5) Trees shall be a minimum of 2.5 to three inches caliper when planted and shall be a mixture of varieties suitable as street trees as approved by the Framingham Tree Warden.

Full Breakdown

Framingham City Code § 530-61 governs parkway and street tree planting inside every new subdivision built in the city. The Department of Public Works, through the Framingham Tree Warden, oversees selection: applicants pick species suitable as street trees, subject to Tree Warden approval, and no tree or shrub may be planted at a street corner or intersection where it would create a visual hazard by blocking sight lines. Spacing is fixed at one street tree every 20 to 30 feet, with a floor of two street trees on every lot the subdivision creates.

Where a road has a sidewalk, street trees go on alternating sides of it; where a road or way has no sidewalk, trees are staggered along the roadway instead. Newly planted stock must measure 2.5 to three inches in caliper. Utility and transformer boxes within the subdivision must be screened on every side with shrubs at least 18 inches tall at planting, sized to eventually match the height of the equipment they hide. The applicant or developer waters and maintains all new street trees and shrubs until they are established, at which point a homeowners' association takes over long-term upkeep of street trees along any unaccepted street, plus any median center strip.

A median or center-strip planting plan must be designed and stamped by a Massachusetts-registered landscape architect, who certifies the planting was installed as designed within 30 days. The Tree Warden's certification of compliance with these planting rules is a prerequisite Inspectional Services checks before it signs off on a certificate of occupancy for lots in the subdivision.

Violations & Fines

Section 530-61 ties enforcement to occupancy: the Framingham Tree Warden must certify that street tree plantings comply with these standards before the Inspectional Services Division issues a certificate of occupancy, so lots with missing, undersized, or misplaced street trees cannot close. The Planning Board can condition subdivision approval on compliant landscaping sheets, and a homeowners' association that lets required street trees die can be required to replace them under the ongoing maintenance duty in § 530-61(B)(9).

Frequently Asked Questions

How far apart must street trees be planted in a new Framingham subdivision?
City Code § 530-61 sets spacing at one street tree every 20 to 30 feet along the road, with a minimum of two street trees on every lot the subdivision creates. Placement alternates sides of the sidewalk where one exists, or staggers along the roadway where there is no sidewalk, and no tree may block sight lines at a corner or intersection.
Who approves the tree species used for parkway plantings?
The applicant or developer selects species in coordination with the Framingham Tree Warden in the Department of Public Works, who must approve the mix of varieties as suitable for street tree use. New trees have to measure 2.5 to three inches in caliper at planting, and the Tree Warden certifies final compliance before Inspectional Services can issue a certificate of occupancy.
Who maintains street trees after a subdivision is built?
The developer waters and cares for newly planted street trees and shrubs until they are established. After that, responsibility shifts to the homeowners' association, which under § 530-61(B)(9) must maintain street trees along any unaccepted street, plantings in a median center strip, and landscaping installed around utility equipment.

Sources & Official References

Other rules in Framingham

All Framingham rules

Compare Framingham to another location·View the Massachusetts tree protection overview

Get notified when Parkway Planting in Framingham, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.