Skip to main content
CityRuleLookup

Pompano Beach, FL Water Use Rules: Recycled Water Rules (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Mandatory connection
Commercial, industrial, multifamily property
New single-family homes
Must install reclaimed water mains
'Available' means
Within 100 feet of property line
Connection deadline
90 days after city notice
3/4"-1" tapping fee
$576 plus $225 meter set fee
Reconnection fee
$20 after nonpayment shutoff

Summary

Pompano Beach Code § 54.04 requires public, commercial, office, industrial, warehouse and multifamily properties to connect to the city's reclaimed water system once it is available, defined as within 100 feet of the property line, with 90 days to connect after notice. New single-family developments must install reclaimed water mains; existing single-family homes can connect voluntarily but still pay an availability charge.

(A) Where available, the owner of every lot or parcel of land within the city utility service district developed for public, commercial, office, industrial, warehousing and/or multifamily use(s) shall connect or cause to be connected, with the reclaimed water distribution system.

(B) Single-family home developments constructed after the effective date of this chapter shall include reclaimed water distribution mains, and shall connect to the system when reclaimed water service becomes available.

(C) Connection to the system is voluntary for all existing residential customers; however, an availability charge will be assessed where reclaimed water service becomes available. ...

(E) For the purposes of this chapter, the term “available” or “availability” shall mean contiguous to or within 100 feet of any property line.

(F) At such time as reclaimed water service becomes available, required connection shall be made within 90 days of notification by the city.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-122: Supplement contains: Local legislation current through 2026-35, passed 7-29-26).

Full Breakdown

Chapter 54, Reuse Water and Cross-Connection Control, defines RECLAIMED WATER as water flowing out of the city's water reclamation facility and governs its distribution alongside backflow-prevention rules for the potable system. 04(A) makes connection mandatory, where available, for public, commercial, office, industrial, warehousing and multifamily property. Division (B) requires new single-family developments built after the chapter took effect to include reclaimed water distribution mains and connect once service is available, while division (C) leaves existing single-family connections voluntary but still subject to an availability charge.

Division (E) defines 'available' as contiguous to or within 100 feet of a property line, and division (F) gives property owners 90 days from the city's notification to complete a required connection. Division (G) bars reverting an irrigation connection back to potable water once tied into reclaimed water. Owners who face a unique, non-self-imposed hardship can seek relief from the City Manager under division (H), with a City Commission appeal available within 30 days of a denial. 05: a tapping fee plus meter set fee scaled to service size, for example $576 tapping plus $225 meter set for a 3/4-inch to 1-inch line, though first-time single-family connections and city-owned dual-check devices are installed at no cost to the homeowner.

Violations & Fines

Any person or customer violating Chapter 54 or a written city order is punishable under § 10.99 and must also pay the city's costs and expenses, including attorney's fees, per § 54.18(A). Each day a violation continues is a separate offense. Violators are additionally liable for the city's expenses, losses or damages, including the cost of correcting unauthorized work, tampering or system damage, under § 54.18(B), and the city can seek an injunction to stop the violation under § 54.18(C). The Pompano Beach Special Magistrate in Code Enforcement has jurisdiction over these violations under § 54.19.

Frequently Asked Questions

Is connecting to Pompano Beach's reclaimed water system mandatory?
Yes for public, commercial, office, industrial, warehouse and multifamily property once service is available, per § 54.04(A). Existing single-family homes may connect voluntarily but pay an availability charge under § 54.04(C).
How long do I have to connect once reclaimed water reaches my property?
Ninety days from the city's notification of availability, under § 54.04(F). 'Available' means the main is contiguous to or within 100 feet of your property line, § 54.04(E).
What does it cost to tap into the reclaimed water main?
For a 3/4-inch to 1-inch service, § 54.05(A) sets a $576 tapping fee plus a $225 meter set fee; larger lines above two inches are priced on consumption and installation cost.
Can I switch my irrigation back to potable water after connecting?
No. Section 54.04(G) prohibits reverting to potable water connections for irrigation once a lot has connected to the reclaimed water system.

Sources & Official References

Other rules in Pompano Beach

All Pompano Beach rules

Florida rules heatmap·Compare Pompano Beach to another location·View the Florida water use rules overview

Get notified when Recycled Water Rules in Pompano Beach, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Recycled Water Rules in Nearby Cities

How other cities in Broward County handle recycled water rules.

Pembroke Pines, FL
Light Restrictions
Hollywood, FL
Some Restrictions
Fort Lauderdale, FL
Some Restrictions
Miramar, FL
Some Restrictions