Key Facts

Authority
Planning Board adopts design guidelines under § 174-10.2
Applies to
Major site plan approval, with or without a special permit
Maximum front setback
20 feet unless waived by the Planning Board
Landscaped green space
Minimum 20% of the lot
Facade buildout
Minimum runs 60% to 75% by lot frontage
Decision deadline
60 days from a complete major site plan application

Summary

In Southborough's Downtown District, § 174-10.2 authorizes the Planning Board to adopt design guidelines and apply them to major site plan approval applications, whether or not a special permit is required. Where a use needs a special permit, the Planning Board issues it with §§ 174-9 and 174-10 and § 174-10.1(A) through (C) in force.

In the Downtown District, major site plan approval shall be by special permit from the Planning Board for any use requiring a special permit. In such cases, the procedural requirements and decision criteria of § 174-9 , § 174-10 , and 174-10.1(A) through (C) shall apply. The Planning Board may adopt design guidelines and apply them to major site plan approval applications regardless of whether a special permit is required. The Planning Board is authorized to promulgate design guidelines to carry forth the purpose and intent of these bylaw provisions.

Full Breakdown

Section 174-10.2, added 11-1-2021 by Special Town Meeting Article 10, makes major site plan approval in the Downtown District a special permit from the Planning Board for any use requiring a special permit. In those cases the procedural requirements and decision criteria of § 174-9, § 174-10 and § 174-10.1(A) through (C) apply. The Planning Board is authorized to promulgate design guidelines and apply them to major site plan applications regardless of whether a special permit is required. The bylaw authorizes those guidelines but does not itself print them.

The design criteria the bylaw does print come through § 174-10.1. Subsection A requires floor plans and architectural elevations of all proposed buildings. Subsection B lists six guidelines: preserve scenic views visible from public ways; keep major building dimensions approximately parallel or perpendicular to a nearby street within 100 feet; match the appearance of primary wall and roof materials to materials commonly found on existing buildings within the Town; produce domestic scale through breaks in wall and roof planes, except for buildings adjacent to Route 9; do not make the building in effect a sign through bold patterns or unconventional form; and keep some consistency with abutting buildings, such as eave height, wall materials or window proportions. Under subsection C a design can be approved despite noncompliance if it is appropriate to its context, has minimal consequence for Town appearance because of low public visibility, or no better compliance would be reasonably possible.

Section 174-8.12 adds Downtown form standards: a maximum front setback of 20 feet unless waived by the Planning Board; minimum landscaped green space of 20%, with at least 50% contiguous between the front building line and front lot line; minimum facade buildout of 60% for 50 to 80 feet of frontage, 70% over 80 to 100 feet and 75% over 100 feet; a principal entrance on the front facade; no more than 35 feet between street-level entrances; and street-level commercial spaces no deeper than 60 feet, with waivers by the Planning Board.

Under § 174-10(F) the Planning Board acts on a complete major site plan application within 60 days of receipt, and failure to act is approval.

Violations & Fines

The Building Inspector, acting as Zoning Enforcement Officer, enforces the bylaw under § 174-24, with a fine not exceeding $300 for each offense and each day a separate offense. Under § 174-10(J), no occupancy permit is given before satisfactory completion of all elements and conditions of the approved site plan, though a temporary occupancy permit can issue with sufficient bonding acceptable to the Planning Board.

Frequently Asked Questions

Who adopts design guidelines for Southborough's Downtown District?
The Planning Board. Section 174-10.2 says the Board may adopt design guidelines and apply them to major site plan approval applications regardless of whether a special permit is required, and authorizes it to promulgate guidelines that carry forth the purpose and intent of the Downtown District provisions.
What design criteria does the Downtown District bylaw print?
Section 174-10.2 pulls in § 174-10.1(A) through (C) for special permit cases. Those require floor plans and architectural elevations, list six design guidelines on views, building orientation, materials, domestic scale, signage-like design and consistency with abutters, and set three grounds for approving a design that departs from them.
Can the Planning Board waive Downtown District building standards?
Yes, for several. Section 174-8.12 lets the Planning Board waive the 20 foot maximum front setback, the minimum facade buildout, the 35 foot maximum distance between street-level entrances and the 60 foot maximum depth of street-level commercial spaces. It can also approve a different placement of landscaped green space during Site Plan Review.
How long does the Planning Board have to decide a major site plan?
Section 174-10(F) requires the Planning Board to act on a complete application and notify the applicant, the Select Board and the Building Commissioner in writing within 60 days of receipt, unless the applicant agrees to an extension. Failure to act within 60 days constitutes approval of the site plan.

Sources & Official References

Other rules in Southborough

All Southborough rules

Compare Southborough to another location·View the Massachusetts zoning overlays & bonuses overview

Get notified when Downtown Design Guide in Southborough, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.