Summary
Appleton requires a permit before excavating for, constructing, enlarging, altering, removing, or demolishing a structure, or changing its occupancy to a use needing greater strength, exits, or sanitary provisions, though ordinary repairs are exempt.
(a) No person shall excavate for a structure or building; construct, enlarge, alter, remove or demolish or change the occupancy of a building from one use to another requiring greater strength, exit or sanitary provisions or change to a prohibited use; or install or alter any wiring equipment or electrical, plumbing, heating and ventilating facilities for which provision is made or the installation of which is regulated by this chapter without first filing an application with the Inspection Supervisor on the form provided in writing and obtaining the required permit therefore, except that ordinary repairs which do not involve any violation of this chapter shall be exempt from this provision.
Official source re-checked September 7, 2026: the cited page had not changed since it was quoted.
Full Breakdown
Municipal Code Sec. 4-66(a) bars anyone from excavating for a structure or building, or constructing, enlarging, altering, removing, or demolishing one, or changing its occupancy from one use to another requiring greater strength, exit, or sanitary provisions, or to a prohibited use, or installing or altering wiring, electrical, plumbing, heating, or ventilating facilities regulated by the building chapter, without first filing a written application with the Inspection Supervisor and obtaining the required permit. Ordinary repairs that do not violate the chapter are exempt from this requirement.
Subsection (b) defines that exemption narrowly: ordinary repairs may be done without an application, but the exemption never covers cutting away a wall or partition, removing or cutting a structural beam or bearing support, removing or changing a required exit, or any addition, alteration, replacement, or relocation of a standpipe, water supply, sewer, drainage, gas, waste, or vent piping, electrical wiring, or other work affecting public health or general safety. The application process in Sec. 4-67 requires the owner, lessee, or their licensed architect or engineer to submit the applicant's name and address, a description of the proposed work and its location, three copies of plans and specifications drawn to scale, and a plot plan showing the new construction, existing structures, and distances from lot lines.
Sec. 4-70 requires the Inspection Supervisor to examine each application within 48 hours and either reject it in writing with reasons or issue the permit as soon as practicable if it conforms to all applicable laws. Sec. 4-161 sets the permit fee schedule by building type and use, covering one- and two-family dwellings, multifamily buildings, commercial and industrial structures, alterations, demolition, building moves, swimming pools, fences, and erosion control, with exact fee amounts kept on file in the City Clerk's office.
Violations & Fines
A notice of violation or order under Sec. 4-24(a) goes to anyone responsible for erecting, constructing, altering, extending, repairing, using, or occupying a building in violation of the chapter, a detailed statement or approved plan, or a permit issued under the chapter, directing them to discontinue the illegal action and abate the violation. If that notice is not promptly complied with, Sec. 4-24(b) lets the Inspection Supervisor issue a citation and ask the City Attorney to seek a court order restraining, correcting, or abating the violation, or requiring removal of the unlawful use.
Frequently Asked Questions
Does a small home repair need a building permit in Appleton?
How long does Appleton take to review a building permit application?
What has to be included in an Appleton building permit application?
What happens if I build without a permit in Appleton?
Sources & Official References
Other rules in Appleton
Compare Appleton to another location·View the Wisconsin building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Building Permits in Nearby Cities
How other cities in Outagamie County handle building permits.