Key Facts
- Permit fee
- Set by city council fee schedule, not fixed
- Late-start penalty
- Fee doubled under Sec. 7-5
- Minimum penalty fee
- Set in council's fee schedule
- ETJ reach
- Extends per G.S. 160D-202, authorized 1972
Summary
Burlington charges a council-set fee for every building, HVAC, plumbing, and electrical permit application, and City Code Section 7-5 doubles that fee, with a minimum from the fee schedule, if the contractor starts the work before the permit is issued.
Any person making application for a permit for buildings, heating and air conditioning, plumbing and electrical inspections shall pay to the city a fee in such amount as established from time to time by the city council. ... Where work for which a permit is required by this Code has started before obtaining the permit, the fees specified for such work shall be doubled but with a minimum fee set forth in the fee schedule adopted by council. The payment of such doubled fee or required minimum fee shall not relieve any person from fully complying with the requirements of this Code and the execution of the work nor from any penalties prescribed herein. It is provided further that this section shall cover all work where a permit is required.
Full Breakdown
Section 7-4 requires anyone applying for a permit covering buildings, heating and air conditioning, plumbing, or electrical inspections to pay the city a fee set from time to time by the city council rather than a fixed amount printed in the code itself; the current figures live in the council's separately adopted fee schedule. That obligation reaches beyond the city limits: Section 7-3 extends Burlington's building construction and inspection enforcement into its extraterritorial jurisdiction under G.S. 160D-202, an arrangement the Alamance County Commissioners authorized on October 2, 1972, and shown on the city's official zoning map.
Section 7-5 backs the fee requirement with a penalty for jumping the gun: if work that needs a permit starts before the permit is obtained, the fee for that work is doubled, subject to a minimum set in the council's fee schedule. Paying the doubled or minimum fee does not let the builder off the hook; the section is explicit that payment does not relieve anyone from fully complying with the Code's requirements and the execution of the work, nor from any other penalty the Code prescribes, and the section applies to all work anywhere a permit is required, not just buildings.
The fee provision traces to Ordinance No. 72-86 in 1972, amended in 1979 and 1987, while the doubled-fee penalty rule traces to Ordinance No. 81-11 in 1981, amended in 1994 and 2009, before both were recodified in 2018. Extra inspection trips caused by a contractor's own errors carry their own escalating fee under Section 7-6, layered on top of the permit fee itself.
Violations & Fines
Starting permitted work before the permit issues automatically triggers the doubled fee under Section 7-5, with the fee never falling below the minimum set in the city's adopted fee schedule. That doubled payment is a floor, not a ceiling: the section preserves every other penalty the Code prescribes for the same violation and does not excuse the builder from completing the work to Code.
Frequently Asked Questions
What happens if I start building in Burlington before getting a permit?
How much does a Burlington building permit cost?
Does Burlington's building permit requirement reach outside the city limits?
Sources & Official References
Other rules in Burlington
Compare Burlington to another location·View the North Carolina building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.