Summary
Unincorporated Canyon County requires a building permit from the Development Services Department before anyone erects, alters, repairs or demolishes a building, per Canyon County Code § 06-01-09. Minor cosmetic repairs to an existing single-family home are exempt, but agricultural buildings still need a separate zoning compliance permit.
(1) Building Permits: It shall be unlawful for any person to erect, construct, enlarge, alter, repair, improve, move, remove, convert or demolish any building or structure unless a separate permit for each building or structure has first been obtained from the County Development Services Department. ... (3) Miscellaneous Exceptions: It is not the purpose of this article to require that permits be obtained or fees paid for repairs and maintenance which do not violate the intent of the nationally recognized codes ... when such repair or maintenance is accomplished on a single-family residence or accessory building thereto. Items designated as follows, in or appurtenant to single-family residences and which do not encroach over subsurface disposal systems or into required yards, are exempt from permits and fees established by this article. The exempt items are: Cabinetwork; Concrete slabs; Driveways, sidewalks and masonry repair; Floor or ceiling covering; Gutters or downspouts; Nonbearing partitions and walls; Painting; Shelving;
Full Breakdown
Canyon County Code § 06-01-09(1) makes it unlawful to erect, construct, enlarge, alter, repair, improve, move, remove, convert or demolish any building or structure in unincorporated Canyon County without a separate permit from the County Development Services Department for each building or structure. Setup of mobile, manufactured and modular homes instead follows the manufacturer's installation manual or the State of Idaho's current Manufactured Home Installation Standard. A narrow list of repair and maintenance items on an existing single-family residence or its accessory building is exempt from both the permit and its fee under § 06-01-09(3): cabinetwork, concrete slabs, driveway, sidewalk and masonry repair, floor or ceiling covering, gutters or downspouts, nonbearing partitions and walls, painting, shelving, and items the Director designates such as ornamental windmills or flagpoles, so long as none of it encroaches over a subsurface disposal system or into a required yard.
An agricultural building, defined as a structure on at least five agriculturally zoned acres housing farm implements, hay, grain, poultry or livestock, does not need a building permit at all, but the owner must still apply for a zoning compliance permit under Idaho Code § 39-4116(5) to confirm the building will not block a required fire-district turnaround and meets road, section-line and utility-easement setbacks. No permit is issued without a current Idaho contractor registration number under Idaho Code § 54-5204, unless the contractor is exempt under §§ 54-5205 or 54-5209, and Health Department or Fire Protection District approval is required first wherever it applies.
Chapter 6, Article 1 also adopts the 2018 editions of the International Building, Residential, Energy Conservation, Mechanical, Fuel Gas and Existing Building codes to govern the actual construction standards.
Violations & Fines
Failing to comply with the permit requirement or any provision of Chapter 6 is a misdemeanor under § 06-01-17, punishable under Idaho Code § 18-113 in the Magistrate Division of the Third Judicial District, with each day of noncompliance a separate offense. The County building official and designated agents enforce the article throughout unincorporated Canyon County under § 06-01-15.
Frequently Asked Questions
Do I need a permit to repaint or re-roof my house in unincorporated Canyon County?
Does a farm building need a building permit?
Can any contractor pull a Canyon County building permit?
What happens if I build without a permit?
Sources & Official References
Other rules in Canyon County