Key Facts

Permit authority
Development services director, Section 5-10
Application requirement
Full value of work stated, Section 5-9
Fence exemption
Wood/steel/vinyl/iron 6 ft or under; masonry 3 ft or under
Pool exemption
Above-ground, under 18 in deep, 5,000 gallons max
Deck exemption
200 sq ft or less, 30 in high max, unattached
Violation class
Misdemeanor, separate offense each day

Summary

Costa Mesa requires a building permit for most construction under Municipal Code Section 5-10, issued by the development services director once an applicant meets all requirements. Section 5-1.1(d) exempts only specific small projects, such as fences under 6 feet, above-ground pools under 5,000 gallons and 18 inches deep, and decks under 200 square feet that stay below 30 inches and are unattached to the dwelling.

Section 105.2 is revised by amending exception 2, 9, and adding 14 as follows: 2. Wood, Steel, Vinyl, or Iron fences not over 6 feet in height. Stucco, concrete, and masonry brick fences not over 3 feet high. 9. Prefabricated swimming pools accessory to a Group R-3 occupancy that are less than 18 inches (457.2 mm) deep, do not exceed 5,000 gallons (18,927.059 L) and are installed entirely above ground. 14. Decks not exceeding 200 square feet (18.58 m2) in area, that are not more than 30 inches (762 mm) above grade at any point, are not attached to a dwelling and do not serve the exit door required by Section R311.2.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4894290; v9 updated 2025-11-18).

Full Breakdown

Section 5-10 authorizes the development services director or a designee to issue building permits under Title 5 whenever the applicant has complied with all the title's requirements, and Section 5-9 requires the applicant to state the full value of the building, structure, or alteration on the permit application, including the value of any labor or materials the owner supplies. 2 exceptions to define what Costa Mesa treats as exempt from a permit: wood, steel, vinyl, or iron fences not over 6 feet high, and stucco, concrete, or masonry brick fences not over 3 feet high; prefabricated above-ground swimming pools for a single-family home that are less than 18 inches deep and hold no more than 5,000 gallons; and decks no larger than 200 square feet that sit no more than 30 inches above grade, are not attached to a dwelling, and do not serve a required exit door.

Anything larger or structurally different than these listed exceptions needs a permit. Additions, alterations, and changes of use must comply with the same construction code provisions as new buildings under Section 5-2(c), and where sections of the adopted codes conflict, the most restrictive requirement governs under Section 5-2(d).

Violations & Fines

Erecting, constructing, enlarging, altering, or occupying a building or structure in violation of Title 5, including working without a required permit, is unlawful under Section 5-6 and is a misdemeanor, with each day the violation continues charged as a separate offense. The city attorney can commence civil or criminal proceedings to abate the violation once a notice and order becomes final, and the property owner is liable for abatement costs, including attorney's fees and court costs.

Frequently Asked Questions

Do I need a permit to build a fence in Costa Mesa?
Not if it is wood, steel, vinyl, or iron and stays 6 feet or under, or stucco, concrete, or masonry brick and stays 3 feet or under. Any taller fence needs a building permit issued under Section 5-10 of the code.
Can I install an above-ground pool without a permit?
Yes, if it is a prefabricated pool for a single-family home, less than 18 inches deep, and holds no more than 5,000 gallons. Larger, deeper, or permanently installed in-ground pools need a building permit under Section 5-1.1(d). Both the 18-inch depth limit and the 5,000-gallon capacity limit must be met for the exemption to apply.
Does my new deck need a building permit?
Not if it is 200 square feet or smaller, stays 30 inches or less above grade, is not attached to the house, and does not serve a required exit door. Any deck bigger or attached needs a building permit. Attached decks always trigger the standard permit process.
What information does a Costa Mesa building permit application need?
Section 5-9 requires the applicant to state the full value of the building, structure, or alteration, including materials and labor the owner supplies personally, since that stated value sets the basis for calculating the permit fee owed. The stated value determines the permit fee charged for the project.

Sources & Official References

Other rules in Costa Mesa

All Costa Mesa rules

California rules heatmap·Compare Costa Mesa to another location·View the California building safety overview

Get notified when Building Permits in Costa Mesa, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Orange County handle building permits.

Irvine, CA
Some Restrictions
Santa Ana, CA
Some Restrictions
Huntington Beach, CA
Some Restrictions
Garden Grove, CA
Some Restrictions
Anaheim, CA
Some Restrictions
Orange, CA
Some Restrictions
Newport Beach, CA
Some Restrictions
Mission Viejo, CA
Some Restrictions