Decatur, GA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit-free repair threshold
under $1,000 in value
Construction start deadline
8 months from permit issuance
Permit expiration, 1-4 units
12 months after issuance
Permit expiration, 5+ units/commercial
24 months after issuance
Renewal fee
equal to original, doubled on 2nd renewal
Penalty
Code of Ordinances § 1-12

Summary

Any Decatur, Georgia owner, agent or contractor who wants to build, alter, move or demolish a building, or install its electrical, gas, mechanical or plumbing systems, must first apply to the Building Official and get a permit under UDO Sec. 10.1.1(B), with minor repairs under $1,000 exempted.

When required, any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace any electrical, gas, mechanical, or plumbing system, the installation of which is regulated by the construction codes, or to cause any such work to be done, shall first make application to the building official and obtain the required permit for the work. ... Ordinary minor repairs and maintenance scopes of work (less than $1000.00 in value) may be made with the approval of the building official without a permit, provided that such repairs shall not violate any of the provisions of the construction codes, and excepting work proposed in a Historic District for which permits are otherwise required.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 28).

Full Breakdown

UDO Sec. 1 sets the baseline: work regulated by the construction codes, including new construction, alteration, moving, demolition or a change of occupancy, and installation or replacement of electrical, gas, mechanical or plumbing systems, all require an application to the Building Official and issuance of a permit first. Sec. 00 in value, which can proceed with the Building Official's approval and no permit, except work in a Historic District, which always needs one. Fees under the City's schedule are due at permit issuance, and Sec.

4 adds reinspection fees when a prior violation is not corrected, work is not ready when scheduled, work is covered before inspection, or a permit is obtained only after a stop-work posting. Sec. g requires construction to begin within 8 months of issuance or the permit and its fees are forfeited. Sec. 5 sets separate expiration clocks: 12 months for residential buildings of four units or fewer, and 24 months for larger residential and all commercial, industrial and institutional work, after which a new permit is needed along with an additional fee equal to the original, doubled on a second or later renewal. The permit number must be posted conspicuously at the site before construction begins.

Violations & Fines

Work started without the required permit, or performed inconsistent with the approved plans, is a violation of Article 10, punishable as provided in Section 1-12 of the Code of Ordinances. The building cannot be occupied for the use shown in the plans until the permitted work is complete and a Certificate of Occupancy has been issued by the Building Official.

Frequently Asked Questions

When do I need a building permit in Decatur, Georgia?
UDO Sec. 10.1.1.B.1 requires a permit from the Building Official before you construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or install, alter or replace an electrical, gas, mechanical or plumbing system regulated by the construction codes.
Is any repair work exempt from a Decatur building permit?
Yes. Sec. 10.1.1.B.2 allows ordinary minor repairs and maintenance valued under $1,000 to proceed with the Building Official's approval and no permit, as long as the work does not violate the construction codes, but this exemption does not apply to work in a Historic District.
How long is a Decatur building permit valid before it expires?
Sec. 10.1.1.B.5 gives permits for residential buildings of four units or fewer 12 months to complete the work, and permits for larger residential, commercial, industrial or institutional projects 24 months, after which a new permit and an additional fee, doubled on a second renewal, are required.

Sources & Official References

Other rules in Decatur

All Decatur rules

Compare Decatur to another location·View the Georgia building safety overview

Get notified when Building Permits in Decatur, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.