Skip to main content
CityRuleLookup

Hollywood, FL Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Governing standard
Florida Building Code Section 104
Exempt repair threshold
under $800 in labor/materials
C.O. minimum wait
48 hours after written application
Fine range
$50 to $500 per offense
Multi-unit rule
separate permit per dwelling unit
Enforcing official
City of Hollywood Building Official

Summary

Hollywood makes it unlawful to construct, alter, repair, move, remove or demolish any building or to install regulated equipment without first filing an application and obtaining a permit from the city. The Building Official also requires a permit for every operation listed in Section 104 of the Florida Building Code, plus any operation the official separately flags as needing one.

(A)(1) It shall be unlawful to construct, enlarge, alter, repair, move, remove or demolish any building, structure or any part thereof; or any equipment, device or facility therein or thereon, or to change the occupancy of a building from one use group ... to another requiring greater strength, means of egress, fire and sanitary provisions; or to change to an unauthorized or prohibited use; or to install or alter any equipment for which provision is made or the installation of which is regulated by the Florida Building Code in effect in Broward County, Florida ... without first having filed an application and obtained a permit therefor from the city. (2) A permit will be required for all operations outlined in Section 104 of the Florida Building Code in effect in Broward County, Florida, as revised from time to time, and for any other operation which the building official determines a permit is necessary. ... (B) No permit will be required for general maintenance or repairs which do not result in a change in occupancy ... and the value of the complete job is less than $800 in labor and materials.

Full Breakdown

130 bars work on any building, structure, or part of one, including a change of occupancy group that demands greater structural strength, egress, fire or sanitary provisions, before a permit is filed for and issued. The rule sweeps in equipment installations regulated by the Florida Building Code, and even burning debris, land clearings, stumps or brush in the open without a permit. A permit will be required for all operations outlined in Section 104 of the Florida Building Code as adopted for Broward County, and the Building Official can require one for anything else deemed necessary.

Townhouse, patio home, garden villa or similar multi-unit projects need a separate permit for each dwelling unit, not one blanket permit for the row. The Building Official is barred from issuing any new permit to an owner or contractor who let a prior permit lapse, built without one, or otherwise violated the Florida Building Code until that problem is resolved. A certificate of occupancy or completion, required under Section 106 of the Florida Building Code, cannot be demanded sooner than 48 hours after a written application is submitted on the Building Official's form. S. 135(C). 131) reinspection fees layered on top of the base permit charge.

Violations & Fines

Violating §§ 151.130 through 151.138 carries a fine of not less than $50 nor more than $500 per offense under § 151.999(C), set by a court of competent jurisdiction. Separately, § 151.131(D) charges any contractor or homeowner who starts work without a valid permit a resolution-set fee, and the Building Official withholds all future permits from that party until the underlying violation is cleared up.

Frequently Asked Questions

Do small repairs in Hollywood, FL need a permit?
No, if the work causes no change in occupancy and the total labor and materials value is under $800 as measured by the R.S. Means 'Cost Data' guide under § 151.135(C). Anything above that threshold, or that changes occupancy, needs a permit under § 151.130 regardless of dollar amount.
What happens if I start construction without a Hollywood building permit?
You owe a resolution-set fee under § 151.131(D) on top of the normal permit and inspection fees, and the Building Official will not issue you any new permit anywhere in the city until the violation is resolved, per § 151.130(A)(3). A court can also fine you $50 to $500 per offense under § 151.999(C).
How fast can I get a certificate of occupancy in Hollywood?
The Building Official cannot be forced to issue one sooner than 48 hours after you submit a written application on the designated form, per § 151.130(A)(4), which implements Section 106 of the Florida Building Code. Larger or more complex projects routinely take longer once plan review and final inspections are factored in.
Does a townhouse project get one permit for the whole building?
No. Section 151.130(A)(2) requires a separate permit for each dwelling unit in a townhouse, patio home, garden villa or similar development, so a builder cannot cover multiple units under a single application.

Sources & Official References

Other rules in Hollywood

All Hollywood rules

Florida rules heatmap·Compare Hollywood to another location·View the Florida building safety overview

Get notified when Building Permits in Hollywood, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Broward County handle building permits.

Pembroke Pines, FL
Some Restrictions
Miramar, FL
Some Restrictions
Coral Springs, FL
Some Restrictions
Fort Lauderdale, FL
Some Restrictions
Pompano Beach, FL
Some Restrictions