Marietta, GA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
International Building Code, GA DCA edition
Permit office
Marietta building official
Application deemed abandoned
6 months with no permit issued
Late-start penalty
100% of usual permit fee
Design seal threshold
3+ stories or 5,000+ sq ft

Summary

Marietta enforces the Georgia-adopted International Building Code and requires anyone who wants to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building to first apply to the building official and obtain a permit under Section 7-4-2-050 before starting work.

b.Building. The provisions of the International Building Code, as adopted and amended by the Georgia Department of Community Affairs, shall apply to the construction, alteration, repair, equipment, use and occupancy, location, maintenance, removal and demolition, of every building or structure or any appurtenances connected or attached to such buildings or structures, except in one- and two-family dwellings. ... Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure ... shall first make application to the building official and obtain the required permit for the work.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 56).

Full Breakdown

Section 7-4-2-030(C)(1)(b) applies the International Building Code, as adopted and amended by the Georgia Department of Community Affairs, to the construction, alteration, repair, use, occupancy, maintenance, removal, and demolition of every building or structure in Marietta, except one- and two-family dwellings, which fall instead under the International Residential Code. Section 7-4-2-050(A)(1) requires the owner, authorized agent, or contractor to file an application with the building official before any such work, listing a general description of the project and its location, signed by the owner or an authorized agent.

Applications must include drawings and specifications when required, sealed by a Georgia-registered architect or engineer for Group A, E, and I occupancies, buildings three stories or taller, or buildings 5,000 square feet or larger, though single-family dwellings never need that seal regardless of size. The building official must act on a complete application without unreasonable delay, issuing the permit if the plans conform to the construction codes or returning them with a written refusal stating the reason if they do not. An application is deemed abandoned six months after filing if no permit has issued, and an issued permit becomes invalid if work is not started within six months or is suspended for six months, subject to 90-day extensions granted in writing for justifiable cause.

Fees follow the governing body's schedule and must be paid before issuance; starting work first adds a 100 percent penalty on top of the normal fee.

Violations & Fines

Starting construction, alteration, or demolition before obtaining the required building permit adds a penalty equal to 100 percent of the usual permit fee under Section 7-4-2-050(G)(2), on top of the fee itself. The building official can issue a written stop-work order for work proceeding contrary to the construction codes or in a dangerous manner, and can revoke a permit obtained through a false statement or built out of conformity with the approved plans; violating the construction codes generally is a misdemeanor under Section 7-4-2-090.

Frequently Asked Questions

When does Marietta require a building permit?
Section 7-4-2-050 requires a permit before anyone constructs, enlarges, alters, repairs, moves, demolishes, or changes the occupancy of a building or structure regulated by the adopted International Building Code, except for ordinary minor repairs the building official approves without a permit. The application goes to the building official with a description of the work and its location.
How long is a Marietta building permit good for?
A permit becomes invalid if the authorized work is not started within six months of issuance, or if it is started and then suspended for six months. The building official can grant one or more extensions of up to 90 days each if the applicant requests one in writing and shows justifiable cause.
What's the penalty for building without a permit in Marietta?
Anyone who begins work on a building, structure, or system before obtaining the necessary permit owes a penalty equal to 100 percent of the usual permit fee, in addition to the fee itself, under Section 7-4-2-050(G)(2). The building official can also stop the work and require compliance before it resumes.

Sources & Official References

Other rules in Marietta

All Marietta rules

Compare Marietta to another location·View the Georgia building safety overview

Get notified when Building Permits in Marietta, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.