Middletown, OH Building Safety: Building Permits (2026)
Key Facts
- Governing section
- § 1406.01
- Residential plan review fee
- $50.00
- Residential base permit fee
- $115.00
- Commercial base fee (up to 5,000 sq ft)
- $210 + $0.40/sq ft
- Tent permit trigger
- over 120 sq. ft., non-personal use
- Certificate of occupancy fee
- $60 residential / $145 commercial
Summary
In the City of Middletown, Ohio, the property owner or an agent must pay the fee set by Middletown Code of Ordinances § 1406.01 before the Division of Building Inspection issues a building permit. The fee schedule covers new residential and commercial construction, additions, renovations, pools and fire protection systems, and a permit is separately required for any temporary tent over 120 square feet used for other than personal purposes.
Before receiving a building permit, the owner of the affected property or his or her agent shall pay the applicable fee specified in this section. ... (g) A certificate of occupancy shall be required for each building or structure whenever its use is changed from one occupancy class to another, or for a part of a building or structure where its use is changed. Inspections shall be made in every case. The fee for such inspection shall be sixty dollars ($60.00) per residential unit, one hundred and forty-five dollars ($145.00) per commercial/industrial unit. The fee shall be in addition to any other fees which may accrue thereafter. ... (i) A building permit is required for any temporary tent that is more than one hundred and twenty square feet (120 sq. ft.) in size and is to be used for other than personal use. The fee for such permit shall be fifty dollars ($50.00).
Full Breakdown
14 for an attached garage, porch, deck or unfinished basement; a state-mandated 1% surcharge is added to every residential permit. 12 per square foot above 10,000 square feet, with a 3% state surcharge. 00 for in-ground pools, which bundles the electric and zoning permits. 00 per commercial unit. 00 permit for any temporary tent larger than 120 square feet put up for anything other than personal use. 02, based on the estimated cost, plus a minimum $100,000 public liability insurance requirement for the demolition contractor.
Violations & Fines
A Middletown building permit becomes invalid under § 1406.03(a) if the authorized work has not started within six months of issuance, or is suspended or abandoned for a full year, though the Chief Building Official may grant written extensions of up to 90 days each for good cause. The Chief Building Official may also revoke a permit outright under § 1406.03(b) if the application or plans contained a false statement or misrepresentation of fact.
Frequently Asked Questions
Do I need a permit to build a new house in Middletown, Ohio?
Does a temporary tent need a permit in Middletown?
When does Middletown require a certificate of occupancy?
How long does a Middletown building permit stay valid?
Sources & Official References
Other rules in Middletown
Compare Middletown to another location·View the Ohio building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.