Skip to main content
CityRuleLookup

Newport News, VA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Built with new home
excluded from floor-area fee
Added to existing home
billed as alteration/repair
Alteration fee rate
0.44%-0.48% of value
Governing sections
Secs. 13-23, 13-26(a)(2)-(3)

Summary

Newport News bills decks and porches under its building permit fee schedule; an unenclosed deck, porch, or stoop built at the same time as a new R3-R5 dwelling is excluded from the floor-area fee computation.

In the case of buildings of use group R3, R4 or R5, any unenclosed carport, deck, porch or stoop, when built in conjunction with and at the same time as the dwelling, shall be excluded from the square footage computation.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 81).

Full Breakdown

Building permit fees for decks and porches run through Chapter 13's fee schedule. If a deck, porch, or stoop is added later to an existing house, it is billed as an alteration or repair under Sec. 13-26(a)(3), at 0.44%-0.48% of construction value. But under Sec. 13-26(a)(2), an unenclosed carport, deck, porch, or stoop for a single-family, two-family, or similar residential building (R3-R5) is excluded from the square-footage computation when it's built in conjunction with and at the same time as the dwelling, lowering the new-construction fee. Sec. 13-23 requires the underlying permit either way.

Violations & Fines

Building a deck or porch before a permit is issued doubles the applicable fee under Sec. 13-26(g), regardless of whether it's built with the house or added later.

Frequently Asked Questions

Do I need a permit for a new deck or porch in Newport News?
Yes. Decks and porches are billed under the city's building permit fee schedule; when built with a new R3-R5 dwelling, the deck's square footage is excluded from the floor-area fee under Sec. 13-26(a)(2).
Does adding a deck to my existing house cost the same as one built with a new house?
No: an added deck is billed as an alteration or repair at 0.44%-0.48% of its construction value under Sec. 13-26(a)(3), rather than being excluded from the floor-area computation.

Sources & Official References

Other rules in Newport News

All Newport News rules

Compare Newport News to another location·View the Virginia building safety overview

Get notified when Building Permits in Newport News, VA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.