Newport News, VA Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Minimum permit fee
$55
0-125A service (1-phase/3-phase)
$55 / $85
Over 200A service (1-phase/3-phase)
$165 / $195
Early-start penalty
permit fee doubled
Reinspection fee
$50
Required inspections
rough, service, final

Summary

Newport News charges a $55 minimum fee for every electrical permit, scaled up by service-panel amperage under section 13-26(c), and requires rough, service and final inspections by a city electrical inspector before section 13-43's certificate of inspection can issue. No power company may energize a connection until that certificate is on file, per section 13-46.

(c)Electrical permits:(1)The minimum permit fee for any electrical permit shall be fifty-five dollars ($55.00).(2)For the installation of each electrical system in new construction, the fee shall be determined from the rated size of service panel(s) in amperes as follows: 0-125 amps $55.00/$85.00; 126-150 amps $85.00/$110.00; 151-200 amps $110.00/$165.00; Over 200 amps $165.00/$195.00. Plus thirty dollars ($30.00) for each additional fifty (50) amperes or fraction thereof.(3)For the installation of a temporary service or the reconnection of a mobile home, the fee shall be fifty dollars ($50.00).(4)For increasing the size of the electrical service to any building, structure or mobile home, the fee shall be fifty dollars ($50.00) for service up to and including two hundred (200) amperes or fifty dollars ($50.00) plus fifteen dollars ($15.00) for each fifty (50) amperes or fraction thereof over two hundred (200) amperes.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 81).

Full Breakdown

Section 13-26(c) sets Newport News electrical permit fees on a sliding scale: a $55 minimum for any electrical permit, then $55/$85 (single-phase/three-phase) for a 0-125 amp new-construction service panel, $85/$110 for 126-150 amps, $110/$165 for 151-200 amps, and $165/$195 for anything over 200 amps, plus $30 for each additional 50 amps or fraction of it. A temporary service hookup or a mobile home reconnection is a flat $50, as is repairing or relocating an existing service without increasing its size; increasing service size up to 200 amps is also $50, plus $15 per additional 50 amps above that. Work started before a permit issues doubles whatever fee would otherwise apply, under section 13-26(g), and a reinspection triggered by faulty work or an unready jobsite adds a $50 service charge under section 13-48. A utility reset inspection, needed to reconnect a structure to electric or gas service, costs $35 under section 13-26(h).

Section 13-42 requires an electrical inspector to perform at least a rough inspection (after wiring is installed but before it is concealed), a service inspection (once the work is ready to energize), and a final inspection covering all fixtures; the inspector can order more inspections for complex jobs. Section 13-43 requires that inspector to issue a certificate of electrical inspection and notify the electric power company. Under section 13-46, it is unlawful for any public utility to connect or reconnect electric or gas service to a building until that inspection has occurred and the certificate has issued.

Violations & Fines

Chapter 13's general penalty applies: an unpermitted or uninspected electrical installation is a misdemeanor punishable by up to $2,500, with escalating fines and possible jail time for repeat offenses at the same property under section 13-2. Starting work before the permit issues doubles the fee under section 13-26(g), and a utility that energizes service without the required certificate violates section 13-46.

Frequently Asked Questions

How much is an electrical permit in Newport News?
The minimum fee is $55. New-construction service panels are charged by amperage and phase: $55 to $85 for 0-125 amps, up to $165 to $195 for anything over 200 amps, plus $30 for each additional 50 amps, under section 13-26(c).
What inspections does my electrical work need?
Section 13-42 requires a rough inspection before wiring is concealed, a service inspection once the system is ready to energize, and a final inspection after all fixtures are installed. The inspector can require more for complex work, and section 13-43 requires a certificate once the final inspection passes.
Can the power company turn on my electricity without an inspection?
No. Section 13-46 makes it unlawful for any utility company to connect or reconnect electric or gas service until the city's certificate of electrical inspection has been issued and the utility has been notified.
What if I start electrical work before getting the permit?
Section 13-26(g) doubles whatever fee would otherwise apply. You will also need to pass the same rough, service and final inspections under section 13-42 before the work can be certified and energized.

Sources & Official References

Other rules in Newport News

All Newport News rules

Compare Newport News to another location·View the Virginia building safety overview

Get notified when Electrical Permits in Newport News, VA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.