Newport News, VA Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
City Code § 13-40
Inspection stages
8 enumerated, plus final
Trigger
Notification from permit holder
Concealment rule
No covering before approval

Summary

Newport News requires a building inspector to sign off at each of eight construction stages, from footing excavation through final inspection, before work may be concealed or the building occupied.

A building inspector shall, upon notification from the permit holder or such holder's agent, make the following inspections of buildings and such other inspections as may be necessary, and shall either approve that portion of the con-struction as completed or shall notify the permit holder or such holder's agent wherein the same fails to comply with the building regulations:(1)Inspection of footing excavations and reinforcement material for concrete footings prior to the placement of concrete.(2)Inspection of foundation systems during phases of construction necessary to assure compliance with the building code.(3)Inspection of preparatory work prior to the placement of concrete.(4)Inspection of structural members and fasteners (framing) prior to concealment.(5)Inspection of electrical, mechanical and plumbing materials and systems prior to concealment.(6)Inspection of energy conservation material (insulation) prior to concealment.(7)Inspection of lath or wallboard prior to plastering or prior to taping and finishing wallboard joints and fasteners.(8)Final inspection to be made and approved after the building, or portion thereof to be occupied under a temporary certificate of occupancy, is ready for occupancy. The building official may designate additional inspections and tests for the above enumerated items to be conducted during the construction or repair of a structure and so notify the permit holder.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 81).

Full Breakdown

Under City Code § 13-40, a building inspector must inspect footing excavations, foundation systems, framing and fasteners, electrical/mechanical/plumbing materials, insulation, and lath or wallboard before each is covered, plus a final inspection before occupancy. No work may proceed past an inspection point until the inspector approves it in place, and reinforcing steel, structural framework, plumbing, electrical wiring, gas piping, and required insulation may not be concealed until inspected and approved by a city-authorized inspector.

Violations & Fines

Concealing work before inspection or building beyond an unapproved inspection point violates Chapter 13; general violations are misdemeanors under § 13-2, fined up to $2,500 per offense.

Frequently Asked Questions

Can framing be covered before it's inspected?
No, § 13-40(c) bars covering structural framework, plumbing, electrical wiring, or insulation until a city inspector has approved it.
Who has to request each inspection?
The permit holder or their agent must notify the building inspector before each required construction stage.

Sources & Official References

Other rules in Newport News

All Newport News rules

Compare Newport News to another location·View the Virginia building safety overview

Get notified when Building Inspections in Newport News, VA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.