Oyster Bay, NY Building Safety: Building Permits (2026)
Key Facts
- Citation
- Oyster Bay Code § 93-15
- Issuing office
- Division of Building, Dept. of Planning & Development
- Shed exemption
- 100 sq ft or less, portable tool sheds
- Permit expires
- 6 months to start, 1 year to finish
- First-offense fine
- Up to $350 or 6 months jail
- Repeat-offense fine
- $350-$700, then $700-$1,000
Summary
The Town of Oyster Bay requires a building permit from the Division of Building before you excavate, construct, alter, remove or demolish any building or structure. Only small portable tool sheds of 100 square feet or less, and non-structural repairs, skip the permit step.
It shall be unlawful to excavate or construct, alter, remove or demolish or to commence the construction, alteration, removal or demolition of a building or structure, except portable-type tool sheds or other noncommercial storage buildings 100 square feet or less, without first obtaining a building permit therefor from the Division of Building of the Department of Planning and Development.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4036544; v24 updated 2023-03-07; through 03-07-2023).
Full Breakdown
Section 93-15 makes it unlawful to excavate, construct, alter, remove or demolish, or to start any of that work, without first getting a building permit from the Division of Building within the Department of Planning and Development. The only built-in exceptions are portable-type tool sheds or other noncommercial storage buildings of 100 square feet or less, and, under § 93-15(C), repairs involving no structural alteration that otherwise comply with the chapter. A separate grading permit from the Commissioner is required under § 93-15(B) whenever you change a parcel's existing or natural grade, though a grading plan folded into a building permit application does not need its own separate permit.
Applications, per § 93-16, must be in writing on the Commissioner's prescribed form and filed by the owner, lessee, or their architect, engineer or builder; anyone other than the fee owner must attach a verified affidavit that the work is authorized. Section 93-17 requires two sets of scaled drawings, including floor plans, elevations, structural details and a plot diagram showing every parking stall and means of ingress and egress. Once issued, § 93-24 gives the permit six months to break ground before it lapses, and one year from issuance to finish the work and obtain a certificate of occupancy before the whole permit expires; the Commissioner can renew it for good cause.
The Commissioner may also suspend or revoke a permit under § 93-25 if the application or plans contained a false statement or misrepresentation of a material fact. 3 before a permit issues.
Violations & Fines
Under § 93-12, amended March 7, 2023, building without a required permit or violating an approved plan is a first-offense violation punishable by up to a $350 fine or six months in jail, or both. A second offense within five years raises the fine to $350 to $700; a third or subsequent offense within five years brings a fine of $700 to $1,000, with jail time capped at six months either way.
Frequently Asked Questions
Do I need a permit to build a small shed in Oyster Bay?
How long is an Oyster Bay building permit valid?
Can I do repairs without a permit?
Who reviews and issues building permits?
Sources & Official References
Other rules in Oyster Bay
New York rules heatmap·Compare Oyster Bay to another location·View the New York building safety overview