Pacifica, CA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
2025 California Building Code
Pre-permit fee for unpermitted work
Equal to normal permit fee
Appeal deadline
10 business days to City Clerk
Appeals heard by
Emergency Preparedness and Safety Commission
Enforcing official
Building Official

Summary

The City of Pacifica has adopted the 2025 California Building Code, with local amendments, to regulate construction, alteration, and demolition of buildings and structures. Before issuing a building permit on unimproved property, the City Engineer can require public improvements like street paving, sidewalks, gutters and curbs to be built as part of the project, and starting work first triggers extra fees.

For the purpose of regulating the erection, construction, enlargement, alteration, repair, removal, demolition, conversion, occupancy, equipment, use, height, area, and maintenance of all buildings and structures and grading in the City of Pacifica, Chapters 1 through 35 ... of that certain Code designated as the California Building Code, 2025 Edition [Title 24, California Code of Regulations, Part 2] ... is hereby adopted by reference and made a part of this chapter as though set forth in this chapter in full ... and said Code shall be known as the Building Code for the City. ... The City Engineer shall require, prior to the issuance of a building permit for the construction of any structure or improvement upon unimproved property within the City where such permit is required and where public improvements, including street paving, sidewalk, gutter and/or curb and miscellaneous facilities do not exist, the construction of such public improvements along such property, constructed in accordance with the City of Pacifica's Engineering Standards, as part of the construction of such structure or improvements.

Full Breakdown

01 adopts Chapters 1 through 35 of the 2025 California Building Code, including the flood-resistant construction and grading appendices, and applies it to the erection, construction, enlargement, alteration, repair, removal, demolition, conversion, occupancy, and maintenance of all buildings, structures and grading in the City. Local amendments in Chapter 8-1 modify that adopted code. 3, which lets the City Engineer require, before issuing a building permit for construction on unimproved property, that the applicant build any missing public improvements, street paving, sidewalks, gutters, curbs and related facilities, along the property as part of the construction project.

Two exceptions apply: the City Engineer can accept a signed agreement to build the improvements later if grades can't practically be set beforehand, and the City Council can waive sidewalks by resolution in areas where they aren't required. 4 so that anyone who starts work requiring a permit before actually obtaining one owes an investigation and processing fee equal to the permit fee, or the amount set in City Administrative Policy No. 2, collected before the permit is issued regardless of whether the City ultimately issues it. 04 if it was issued in error or based on incomplete information, or if work departs from approved plans or conditions. 09.

Violations & Fines

Starting work before a permit issues triggers an investigation and processing fee equal to the normal permit fee under Section 8-1.06, whether or not the City later issues the permit. Beyond that, Section 8-1.10 makes violating the Technical Codes, including building, altering or maintaining a structure without a required permit, a misdemeanor, with each day the violation continues counting as a separate offense.

Frequently Asked Questions

What happens if I start construction in Pacifica before getting a permit?
Section 8-1.06 requires paying an investigation and processing fee equal to the normal building permit fee, collected before the permit issues, regardless of whether the City ultimately grants it, on top of any other fees for inspections or testing the illegal work requires.
Can Pacifica require me to build sidewalks before it issues my building permit?
Yes. Section 8-1.03 lets the City Engineer require street paving, sidewalks, gutters and curbs to be built along unimproved property as part of the permitted construction, though the Engineer can accept a signed agreement to build them later if grading practicalities prevent it.
How do I appeal a Pacifica Building Official's permit decision?
Section 8-1.09 requires a written appeal filed with the City Clerk within ten business days of the decision, including the appeal fee, and the appeal is heard by the Emergency Preparedness and Safety Commission, whose decision is final and binding.

Sources & Official References

Other rules in Pacifica

All Pacifica rules

California rules heatmap·Compare Pacifica to another location·View the California building safety overview

Get notified when Building Permits in Pacifica, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.