Portland, ME Building Safety: Building Permits (2026)
Key Facts
- Permit required for
- construction, alteration, demolition, plumbing, electrical work
- Late-permit surcharge
- double the scheduled fee, § 6-92(d)
- Occupancy requirement
- certificate of occupancy required, § 6-93(a)
- Appeal deadline
- 10 days to board of appeals, § 6-96(a)
- Base penalty range
- $200-$2,500 per day per violation
- Escalated penalty
- up to $10,000/day after second notice
Summary
Portland requires a permit from the building authority before any construction, alteration, demolition, plumbing, or electrical work begins under City Code § 6-92(a). Occupying a building without a certificate of occupancy is barred under § 6-93, and a permit obtained after work has already started costs double the scheduled fee under § 6-92(d).
(a) No person may commence work on any of the following without first obtaining a permit from the building authority: 1. Constructing, enlarging, altering, repairing, moving, converting, demolishing, or changing the use of any building or structure; 2. Installing, removing, or altering plumbing or plumbing fixtures, or subsurface waste water disposal systems or components; 3. Installing, removing, or altering electrical or signaling conductors, equipment and raceways, or optical fiber cables and raceways... (d) The fee for any permit obtained after work has been commenced shall be double the fee otherwise provided for in the fee schedule adopted pursuant to this section.
Official source re-checked September 7, 2026: the cited page had not changed since it was quoted.
Full Breakdown
Portland Code of Ordinances § 6-92(a) bars anyone from commencing work on constructing, enlarging, altering, repairing, moving, converting, demolishing, or changing the use of any building or structure, or on installing, removing, or altering plumbing, subsurface waste-water disposal components, or electrical/signaling conductors and raceways, without first obtaining a permit from the building authority. Narrow exceptions cover replacing lamps or portable devices in existing receptacles, telephone or telegraph transmission, and municipal signal, fire alarm, and public-utility maintenance work (§ 6-92(a)(3)). Permit and inspection fees follow the fee schedule the City Council adopts, and § 6-92(c) lets the city recalculate a permit fee against national cost standards if a submitted project cost looks understated.
Under § 6-92(d), a permit obtained after work has already commenced costs double the scheduled fee, and § 6-92(e) directs the Permitting and Inspections Department Director to adopt a refund policy for fees paid under the section. No building, structure, or property may be used or occupied without a certificate of occupancy under § 6-93(a), and § 6-93(c) requires the fire chief's approval before a final certificate issues; phased occupancy is allowed only where permits or plans specifically provide for it. Enforcement runs through § 6-95: the building authority may issue a stop-work order halting further work until violations are corrected, with a removal fee set in the fee schedule adopted under § 6-16, and may cut electrical wires or disconnect a circuit found to have been wired without a permit or out of compliance.
An aggrieved party has ten days from the building authority's action to appeal to the board of appeals under § 6-96(a), which may grant a variance only on a showing of undue hardship that does not compromise public health, safety, and welfare; the building authority's order is not stayed during the appeal.
Violations & Fines
Section 6-1 sets per-day penalties: a significant code violation runs $200-$2,500 per day, rising to $500-$5,000 per day after a first written correction notice and $1,500-$10,000 per day after a second notice. Occupant-load violations under MUBEC or Chapter 10 cost $250 for a first offense, $500 for a second, and $1,000 for a third and later violation, calculated on a rolling twelve-month basis; other violations run $100-$2,500 per day under § 6-1(a)(3).
Frequently Asked Questions
Do I need a permit for small electrical repairs in Portland, Maine?
What happens if I start work before pulling a permit in Portland?
Can I occupy a new building in Portland before final inspection?
How do I appeal a Portland building authority decision?
Sources & Official References
Other rules in Portland
Compare Portland to another location·View the Maine building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.