Key Facts

LEED Silver threshold
2,000 sq ft, city-owned/occupied/funded projects
Energy-model threshold
5,000 sq ft floor area
New construction improvement
30% above ASHRAE 90.1 baseline
Existing buildings improvement
25% above ASHRAE 90.1 baseline
Historic buildings improvement
20% above ASHRAE 90.1 baseline
Adopted
Council Order 187-08/09, 4-6-2009

Summary

Portland's Green Building Code, Chapter 6 Article VII, requires new construction and renovation projects owned, occupied, or funded in part by the City of Portland to reach LEED Silver certification at 2,000 square feet and up, with steeper energy-performance gains required above 5,000 square feet. It doesn't reach privately funded construction.

All new construction and renovation projects to be owned or occupied by the city of Portland, or to be funded in whole or in part by the City of Portland, that are of 2,000 square feet in floor area or greater shall be certified at or above the most recently published and applicable LEED Silver Standard using appropriate LEED Rating System, and shall be certified by a licensed engineer or qualified professional as compliant with the Better Roof Requirements contained in Section 6-175 below.

View official code

Official source re-checked September 7, 2026: the cited page had not changed since it was quoted.

Full Breakdown

Article VII of Chapter 6, adopted by Council Order 187-08/09 on April 6, 2009, sets energy-performance and roofing standards for public building projects rather than for private construction generally. Section 6-167 requires any new construction or renovation project owned or occupied by the City of Portland, or funded in whole or in part by the city, that reaches 2,000 square feet of floor area to be certified at or above the current LEED Silver Standard, plus certified compliant with the 'Better Roof Requirements' of Section 6-175.

1 baseline of at least 30% for new construction, 25% for existing buildings, and 20% for historic buildings. 'Funded in whole or in part' is defined in Section 6-166 to include any tax increment financing over $50,000, or any combination of city grants, HOME loans, CDBG loans, or Neighborhood Stabilization funds exceeding $50,000 in aggregate value to the project. Applicants submit a LEED checklist or equivalent third-party certification documentation with their building permit application under Section 6-168, and must file final LEED documentation (or an engineer's certification of equivalent compliance) with the Department of Planning and Urban Development before the city issues a certificate of occupancy, per Section 6-169.

Section 6-170 allows a partial exemption where compliance is a demonstrated hardship, for example, a conflict with other government building requirements, or alterations that would compromise a historic building's character as determined by the Historic Preservation Board, but the applicant carries the burden of proof and must show maximum effort toward the standard.

Violations & Fines

Portland doesn't fine noncompliant projects directly; instead, Section 6-169 withholds a permanent certificate of occupancy until the applicant files final LEED documentation, or an engineer's certification of equivalent compliance, with the Department of Planning and Urban Development. The city may issue only a temporary certificate of occupancy in the meantime, and any partial exemption must be requested up front under Section 6-170, not after the fact.

Frequently Asked Questions

Does Portland's green building code apply to private homes?
No. Section 6-167 applies only to new construction or renovation projects owned or occupied by the City of Portland, or funded in whole or in part by the city, meaning city buildings and projects that receive qualifying city funding such as tax increment financing, HOME loans, or CDBG loans over $50,000.
What certification does a qualifying Portland project need?
Projects of 2,000 square feet or more must reach LEED Silver certification (or equivalent) plus comply with the Better Roof Requirements in Section 6-175. Projects of 5,000 square feet or more must also hit an ASHRAE 90.1 energy-performance improvement of 30% for new construction, 25% for existing buildings, or 20% for historic buildings.
Can a qualifying project get out of the LEED requirement?
Only through a partial exemption under Section 6-170, granted by the director of planning and urban development, and only where the applicant proves hardship or infeasibility, such as a conflict with other government requirements or alterations that would compromise a historic building's character, while showing maximum effort toward the standard.

Sources & Official References

Other rules in Portland

All Portland rules

Compare Portland to another location·View the Maine building safety overview

Get notified when Green Building Code in Portland, ME changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.