Provo, UT Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permitting agency
Building Inspection Division
Permit types
Full building permit or fast-track permit
Occupancy step
Certificate of Occupancy required before use
Records retention
Plat/survey applications kept 1 year
Violation class
Misdemeanor under Ch. 14.42

Summary

Provo requires a building permit from the Building Inspection Division before any building or structure is constructed, reconstructed, altered, or moved, and before any change in the use of land. The city issues either a full building permit or a fast-track permit.

No building or structure shall be constructed, reconstructed, altered, or moved, nor shall the use of land be changed except after the issuance of a permit for the same by the Building Inspection Division. For the purposes of this Section the issuance of a building permit will constitute a full building permit or fast track permit.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 2026-17, passed June 9, 2026).

Full Breakdown

060 makes it unlawful to build, rebuild, alter, or relocate any structure, or to change how land is used, without first obtaining a permit from the Building Inspection Division. The code recognizes two permit tracks: a full building permit and a fast-track permit, both of which satisfy this requirement. 070: the Building Inspection Division cannot issue a permit for construction, alteration, moving a building onto a lot, or a use change if doing so would violate Title 14, and no water, sewer, or electrical utility connection may be installed to serve a use that would violate the zoning title.

080 additionally requires new-construction applications (not interior remodels) to include a scaled plat and a certified survey identifying any conflicts with adjoining property, plus a preliminary title search; the Building Inspector keeps these records for one year. 090 makes it unlawful to occupy any building or premises before a Certificate of Occupancy and Zoning Compliance is issued by the Planning Commission following final inspection by the Building Inspection Division, and a new certificate is required if occupancy intensity later increases (for example, more than a 5% rise in the declared number of occupants in an apartment or multi-residential building).

Violations & Fines

Occupying a building without the required Certificate of Occupancy and Zoning Compliance, or after its intensity of use has changed beyond the certificate's terms, is a misdemeanor punishable under Chapter 14.42, Provo City Code, and the code separately declares such unauthorized occupancy a nuisance subject to abatement. A permit or license issued in conflict with Title 14 is void from the start.

Frequently Asked Questions

Does Provo require a permit for interior remodels?
A general building permit is still required for construction, alteration, or reconstruction, but the plat and survey requirement of Section 14.01.080 applies only to new construction, not interior remodels, when property boundaries are unclear.
Can I move into a new building before final inspection?
No. Section 14.01.090 makes it unlawful to occupy any building or premises until Provo's Planning Commission issues a Certificate of Occupancy and Zoning Compliance after the Building Inspection Division completes a final inspection.
What happens if I add more residents than my certificate allows?
If occupancy in an apartment or multi-residential building rises more than 5% above the number declared in the existing Certificate of Occupancy, Section 14.01.090(2) requires a new certificate before that higher occupancy is lawful.

Sources & Official References

Other rules in Provo

All Provo rules

Compare Provo to another location·View the Utah building safety overview

Get notified when Building Permits in Provo, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Utah County handle building permits.

Orem, UT
Some Restrictions
Eagle Mountain, UT
Some Restrictions
Lehi, UT
Some Restrictions