Skip to main content
CityRuleLookup

Provo, UT Building Safety: Childcare Center Rules (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required
Conditional Use Permit (Planning Commission)
Building standard
International Building Code before occupancy
State license deadline
Within 60 days of City approval
Playground fence
6-foot fence around full perimeter
Site plan
Must show parking, circulation, drop-off
Family Group Day Care cap
12 children (home-based, separate rule)

Summary

A Child Day Care Center in Provo needs a Conditional Use Permit and must meet Section 14.34.250(7)(b)'s building, licensing, site-plan, and fencing standards before it can open, including International Building Code compliance and a six-foot fence around the outdoor playground.

(a) Family Group Day Care (defined in Section 14.06.020, Provo City Code). (i) The provider is limited to twelve (12) children. The provider must reside in the residence where services are provided. (b) Child Day Care Centers (defined in Section 14.06.020, Provo City Code). (i) All Centers must comply with the International Building Code prior to occupancy and must receive a license from the State of Utah within sixty (60) days after approval by the City; (ii) A site plan shall be submitted identifying parking, vehicle circulation and drop off/pick up locations. The Development Services Director or designee shall ensure that the site plan meets these requirements; and (iii) Outdoor playground area shall have a six (6) foot fence around the perimeter.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 2026-17, passed June 9, 2026).

Full Breakdown

040 before the center can operate. 250(7)(b) layers on center-specific standards: the building must comply with the International Building Code before anyone occupies it, and the operator must obtain a license from the State of Utah within 60 days after the City approves the use. The operator also has to submit a site plan showing parking, vehicle circulation, and drop-off and pick-up locations, which the Development Services Director or a designee reviews for adequacy, and the outdoor playground area must be enclosed by a six-foot fence around its entire perimeter.

270 caps at six children and layers on a Home Occupation Permit. A Child Day Care Center, by contrast, is a standalone commercial or institutional use subject to the full conditional-use process, the IBC, and the state licensing deadline.

Violations & Fines

Section 14.02.040(6) makes any use contrary to the Conditional Use Permit unlawful, including operating a center before the permit is obtained or continuing after the required International Building Code, site-plan, or fencing conditions go unmet, and the City may enjoin that use. Section 14.02.070 lets the Planning Commission hold a hearing and modify or revoke the Conditional Use Permit outright if the center is 'materially altered or expanded beyond the scope of the use originally authorized' or a nuisance is found.

Frequently Asked Questions

Does opening a child day care center in Provo require a special permit?
Yes. It is a conditional use, not a by-right use, so the operator needs a Conditional Use Permit from the Planning Commission under Section 14.02.040 in addition to meeting the center-specific standards in Section 14.34.250(7)(b), such as International Building Code compliance and the state license deadline.
How is a Child Day Care Center's outdoor play area regulated?
Section 14.34.250(7)(b)(iii) requires the outdoor playground area to have a six-foot fence around its entire perimeter. The center also has to submit a site plan showing parking, vehicle circulation, and drop-off and pick-up locations for the Development Services Director to review.
How long does a Provo child care center have to get its state license?
Section 14.34.250(7)(b)(i) gives the operator 60 days after the City approves the use to obtain a license from the State of Utah, and the center must also meet the International Building Code before anyone occupies the building.
Can Provo revoke a day care center's conditional use permit?
Yes. Section 14.02.070 lets the Planning Commission hold a hearing and modify or revoke the permit if the use has been materially altered or expanded beyond what was authorized, or if it has become a nuisance, and Section 14.02.040(6) makes operating outside the permit's terms unlawful.

Sources & Official References

Other rules in Provo

All Provo rules

Compare Provo to another location·View the Utah building safety overview

Get notified when Childcare Center Rules in Provo, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Childcare Center Rules in Nearby Cities

How other cities in Utah County handle childcare center rules.

Orem, UT
Some Restrictions
Eagle Mountain, UT
Some Restrictions
Lehi, UT
Some Restrictions