Provo, UT Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Code adopted
National Electrical Code, per State Building Code
Legal basis
Utah Code 58-56-4
Fee source
Municipal Council Consolidated Fee Schedule
Penalty basis
General penalty, Provo City Code 1.03.010

Summary

Provo enforces electrical work through the state-mandated National Electrical Code, adopted as part of the State Building Code under City Code 9.52.010. Fees follow the city's Consolidated Fee Schedule, and violations carry the same criminal penalties as any other technical code breach.

As required by Section 58-56-4 of the Utah Code, Provo City shall adhere to the building code, National Electrical Code, plumbing code, and mechanical code as promulgated by nationally recognized code authorities and adopted by the Utah Uniform Building Code Commission (collectively, the 'State Building Code'). ... Notwithstanding any contrary provision in the technical codes adopted herein, the fees applicable to said technical codes shall be the fees shown on the Consolidated Fee Schedule adopted by the Municipal Council.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 2026-17, passed June 9, 2026).

Full Breakdown

Provo does not write its own electrical code. Section 9.52.010(1) states that, as required by Section 58-56-4 of the Utah Code, Provo City shall adhere to the building code, National Electrical Code, plumbing code, and mechanical code as promulgated by nationally recognized code authorities and adopted by the Utah Uniform Building Code Commission, together called the 'State Building Code.' Whenever the Utah Legislature adopts a new or revised edition of any of those component codes, by statute or administrative regulation, Provo's ordinance automatically refers to that updated edition, so the applicable National Electrical Code edition tracks the state's adoption cycle rather than a separately timed city update.

Subsection (2) layers a short list of additional technical codes on top of the State Building Code, the Uniform Code for the Abatement of Dangerous Buildings, the Uniform Code for Building Conservation, and the 1987 NCS BCS manufactured home installation standard, but none of the local amendments listed in Subsection (3) touch the National Electrical Code specifically; the electrical component travels through unmodified from the state edition.

Fees for electrical permit work are pulled out of the ordinance text itself. Subsection (4) states that, notwithstanding any contrary provision in the adopted technical codes, the fees applicable to those codes are whatever fees appear on the Consolidated Fee Schedule adopted by the Municipal Council, meaning electrical permit costs are set administratively and can change without a Title 9 ordinance amendment. Subsection (5) ties enforcement to the city's general criminal penalty statute, Section 1.03.010, so violating the adopted National Electrical Code, doing electrical work without the required permit, is punishable the same way as any other misdemeanor code violation, up to a $1,000 fine or six months in jail for a straight misdemeanor, less for lesser classifications.

Violations & Fines

Electrical work performed in violation of the adopted National Electrical Code, or without the permit that code requires, is enforced under Provo City Code 9.52.010(5), which routes penalties through the general criminal violation statute at Section 1.03.010: up to a $1,000 fine and six months in jail for a straight misdemeanor violation, with lesser fines for infractions.

Frequently Asked Questions

Does Provo have its own electrical code?
No. Section 9.52.010(1) adopts the National Electrical Code as promulgated by the Utah Uniform Building Code Commission, as required by Utah Code 58-56-4. Provo enforces whichever edition the state has currently adopted rather than writing a separate local code.
Where do I find electrical permit fees?
Section 9.52.010(4) sets fees for all adopted technical codes, electrical included, by the Consolidated Fee Schedule adopted by the Provo Municipal Council, not a fixed dollar figure written into the ordinance itself.
What's the penalty for unpermitted electrical work in Provo?
Section 9.52.010(5) applies the city's general criminal penalty statute, Section 1.03.010, to technical code violations, meaning a straight misdemeanor violation can draw a fine up to $1,000, imprisonment up to six months, or both.

Sources & Official References

Other rules in Provo

All Provo rules

Compare Provo to another location·View the Utah building safety overview

Get notified when Electrical Permits in Provo, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.