Lehi, UT Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- 2017 National Electrical Code
- AHJ (NEC)
- Assistant Building Official
- AHJ (NESC)
- Power Dept Operations Manager
- Utility note
- Lehi runs its own electric utility
- Default penalty
- Class B misdemeanor (§1-4-1)
Summary
Lehi has adopted the 2017 National Electrical Code as its electrical standard under City Code section 10-2-1(H), with the Assistant Building Official acting as the authority having jurisdiction. The city separately adopted the 2017 National Electric Safety Code, administered by the Power Department Operations Manager because Lehi runs its own municipal power utility.
H. National Electrical Code: The 2017 National Electrical Code, which is promulgated by the National Fire Protection Association, is approved and adopted as the Electrical Code for the City.
Full Breakdown
City Code section 10-2-1(H) approves and adopts the 2017 National Electrical Code, published by the National Fire Protection Association, as the Electrical Code of the City, and section 10-2-1(I) separately adopts the 2017 National Electric Safety Code as the city's Electrical Safety Code. Under section 10-2-3(B)(8), the Assistant Building Official is the AHJ for permits and inspections under the National Electrical Code, while section 10-2-3(B)(9) assigns the Power Department Operations Manager as AHJ for the National Electric Safety Code, reflecting that Lehi runs its own municipal electric utility rather than buying power service from an investor-owned company.
01852. An owner who cannot practically meet a specific NEC or NESC requirement may apply in writing to the appropriate AHJ under section 10-2-3(A), stating the reason, the requested modification, and why it preserves the code's safety intent; the AHJ must decide within thirty days. Because Title 10, Chapter 2 has no penalty section of its own, an electrical-code violation is punished under the citywide general penalty at section 1-4-1, up to the maximum class B misdemeanor fine under Utah Code section 76-3-301, up to six months imprisonment, or both.
Violations & Fines
A violation of the adopted NEC or NESC falls back on the citywide general penalty, City Code section 1-4-1: a fine capped at the maximum class B misdemeanor amount under Utah Code section 76-3-301, up to six months imprisonment, or both. The Assistant Building Official, or for the electric safety code the Power Department Operations Manager, enforces compliance as AHJ.
Frequently Asked Questions
What electrical code does Lehi enforce?
Why does Lehi have two electrical codes?
How much does a Lehi electrical permit cost?
What is the penalty for unpermitted electrical work?
Sources & Official References
Other rules in Lehi
Compare Lehi to another location·View the Utah building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in Utah County handle electrical permits.