Skip to main content
CityRuleLookup

Lincoln, NE Building Safety: Childcare Center Rules (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Plan review
Required before new/relocated/remodeled facility opens
Review timeline
30 days after Health Director receives plans
Playground fall zone
Resilient surfacing required, no sand or grass
Infant rooms
Dedicated diapering surface plus plumbed hand sink
Enforcement
Lincoln-Lancaster County Health Director

Summary

Before opening, relocating, or remodeling a child care program, Lincoln requires architectural plans submitted to the Health Director, who must complete review within thirty days of receiving complete plans.

After the effective date of this ordinance, any newly proposed, relocated, or remodeled child care program must submit architectural plans or to-scale drawings of the premises and building in which a child care program shall be operating to the Health Director for review. The Health Director shall review such plans within thirty days of receipt of full plans or drawings.

Source: Lincoln-Lancaster County Health DepartmentView official code

Full Breakdown

The Health Department administers a separate track for facility construction: before a new, relocated, or remodeled child care program opens, the operator must submit architectural plans or to-scale drawings of the premises to the Health Director, who reviews them within thirty days. This sits alongside the annual certificate-of-compliance inspection under LMC Chapter 8.14. Physical build standards elsewhere in the chapter require infant rooms to have a dedicated diapering surface and permanently plumbed hand sink, and playground equipment with a fall height over six feet or a fall zone deeper than 24 inches must sit on resilient surfacing, not sand, dirt, grass, or concrete.

Violations & Fines

Operating a child care program without an approved certificate of compliance, or opening/relocating/remodeling without Health Director plan review, is unlawful and can trigger a cease-operation order.

Frequently Asked Questions

Does Lincoln require plan review before opening a child care center?
Yes. LMC § 8.14.033 requires submission of architectural plans or to-scale drawings to the Health Director before a new, relocated, or remodeled child care program begins operating, with review completed within thirty days.
What agency reviews the facility plans?
The Lincoln-Lancaster County Health Director reviews the plans and also issues the annual certificate of compliance required to legally operate a child care program in Lincoln.

Sources & Official References

Other rules in Lincoln

All Lincoln rules

Compare Lincoln to another location·View the Nebraska building safety overview

Get notified when Childcare Center Rules in Lincoln, NE changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.