Summary

Acworth enforces the Georgia State Minimum Standard Electrical Code on every electrical installation, addition, alteration or repair inside city limits. The Building Department issues the permit, sets the fee under the city's schedule of fees and charges, and inspects wiring before it can be closed in or energized. Building without one is treated as unlawful construction activity.

(6)Georgia State Minimum Standard Gas Code(7)Georgia State Minimum Standard Electrical Code(8)Georgia State Minimum Standard Energy Code ... Associated fees pertaining to the adopted construction codes listed section 18-31 shall include, but are not limited to: residential and commercial building, duct and envelope tightness verification, mechanical, heating, venting and air conditioning, plumbing, electrical, gas, energy, retaining walls, swimming pools, signs, copies of records, and penalties, as adopted by the mayor and board. ... 7.Electrical: The provisions of the Georgia State Minimum Standard Electrical Code, as adopted and amended by the Georgia Department of Community Affairs, shall apply to the installation of electrical systems, including additions, alterations, repairs, replacement, equipment, appliances, fixtures fittings and appurtenances thereto.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 27).

Full Breakdown

Section 18-31 of the Code of Ordinances adopts the state's minimum construction codes, including the Georgia State Minimum Standard Electrical Code, "the latest edition as adopted and amended by the state department of community affairs," for enforcement inside Acworth. Section 18-32 makes it unlawful for anyone, commercial or residential, to build "unless such construction is accomplished in strict compliance with the various construction codes adopted by this article," which covers electrical work along with the building, dwelling, fire, plumbing, mechanical, gas and energy codes. " Section 18-35 folds electrical work into the same permit and inspection fee schedule that covers building, plumbing, mechanical, gas and energy permits, with the dollar amount set by the mayor and board of aldermen and kept on file with the city clerk.

Section 18-52 also shields the city from liability: issuing a permit or passing an inspection is not a warranty on the physical condition of the wiring or system. Anyone doing electrical work, from a panel upgrade to a full rewire, needs this permit and the resulting inspection before the work can be covered or energized; work done outside the adopted code is treated the same as any other unlawful construction under section 18-32.

Violations & Fines

Section 18-34 punishes any construction-code violation, including unpermitted electrical work, under the city's general penalty in section 1-11: a fine of up to $1,000.00, up to six months in jail, up to 60 days of public works labor, or a combination, at the municipal court's discretion. Section 1-11 also makes each day the violation continues a separate offense, so an uninspected panel or unpermitted rewire left in place keeps accruing exposure until it is corrected.

Frequently Asked Questions

Does Acworth require a permit for electrical work?
Yes. Section 18-31 adopts the Georgia State Minimum Standard Electrical Code for the city, and section 18-32 makes it unlawful to build, including electrical installations, additions, alterations or repairs, without complying with the adopted code and obtaining the required permit from the Building Department.
What code governs Acworth's electrical work?
The Georgia State Minimum Standard Electrical Code, in the latest edition adopted and amended by the state department of community affairs, applies under section 18-31(a)(7) and is detailed further in section 18-53 to cover installations, additions, alterations, repairs and replacement of electrical systems.
What happens if I skip the permit?
Section 18-34 makes any construction-code violation punishable under the city's general penalty, section 1-11: up to a $1,000 fine, up to six months in jail, or up to 60 days of public works labor, with each day of the violation counted as a separate offense.
Who inspects electrical permits in Acworth?
Section 18-33 designates a city official as responsible for enforcing the adopted construction codes, and that official, through the Building Department, performs the inspections tied to each electrical permit before work can be closed in or energized.

Sources & Official References

Other rules in Acworth

All Acworth rules

Compare Acworth to another location·View the Georgia building safety overview

Get notified when Electrical Permits in Acworth, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.