Apple Valley, MN Building Safety: Electrical Permits (2026)
Key Facts
- Permit required
- Before any electrical work, § 150.06(B)(1)
- New structures
- State-licensed electrical contractors only
- Owner permits
- Existing residence only, and owner must reside there
- Standard
- National Electrical Code and § 150.06
- Correction window
- 15 days, or immediate disconnection for imminent hazard
- Rough-in
- Inspection required before concealment
Summary
In the City of Apple Valley, Minnesota, no one can perform electrical work without an electrical permit first issued by the city. Permits go to state-licensed electrical contractors, or to a resident owner for work in the owner's own home, and the work is inspected against the National Electrical Code.
(B) Permit and inspection required. (1) General permit requirement. No person shall perform electrical work without an electrical permit first issued by the city. Permits for electrical work in new structures shall only be issued to electrical contractors duly licensed by the state. Permits for the installation, alteration, addition or repair of electrical work in existing structures shall only be issued to electrical contractors duly licensed by the state or for electrical work in a residential property, to the property owner provided he/she resides within the residential structure where the work is to be done. ... (b) All work which involves the concealment of electrical work shall have a "rough-in" inspection prior to concealment. The electrical work shall not be concealed until the Electrical Inspector has approved the work.
Full Breakdown
Section 150.06 of the Apple Valley Code of Ordinances governs electrical permits and inspections in the City of Apple Valley, Dakota County, Minnesota. Electrical work means the installing, altering, repairing, planning, or laying out of electrical wiring, apparatus, or equipment for electrical light, heat, power, technology circuits or systems, or other purposes, including any work regulated by the Minnesota Electrical Act.
Who can pull a permit: for new structures, only electrical contractors duly licensed by the state. For existing structures, licensed contractors, or, for electrical work in a residential property, the property owner provided he or she resides within the residential structure where the work is done. Work on equipment owned, leased, operated or maintained by a utility service provider needs no permit, but it must conform to the minimum standards of the National Electrical Code (§ 150.06(B)(2)).
The application is made in writing on a city form and gives the applicant's name, address and telephone number, the address and legal description of the property, proof of the appropriate licensure, a brief description of the work, and the plans, specifications and schedules needed to show conformity with legal requirements. No permit issues until the electrical permit fee in the appendix to Chapter 35 is paid, and no inspection occurs until the inspection fee is paid.
The Electrical Inspector, a licensed master or journeyman electrician working under the Building Official, inspects the work under the National Electrical Code. Concealed work needs a rough-in inspection first. Under § 150.06(C), every installation must be reasonably safe to persons and property and conform to the section, the National Electrical Code and the applicable Minnesota Statutes, buildings moved into the city must meet the requirements for new buildings, and buildings changed in use must meet the code for the new use.
If inspection finds work out of compliance, the Electrical Inspector issues a written notice and the permit holder has 15 days to comply before disconnection. Imminent hazards can be disconnected at once. Section 150.06(D) makes it unlawful to connect any electrical utility service for work with no permit, or service ordered disconnected, and the utility disconnects on the Building Official's written order.
Violations & Fines
Performing electrical work without a permit violates § 150.06(B)(1), and connecting electrical utility service for work with no permit, or service the Building Official has ordered disconnected, is unlawful under § 150.06(D)(1). Chapter 150 violations are misdemeanors punishable as provided in § 10.99 under § 150.99. Defective work draws a written notice and then disconnection after 15 days, or at once for an imminent hazard.
Frequently Asked Questions
Can a homeowner pull an electrical permit in Apple Valley?
Does the utility company need a city electrical permit?
What happens when the Electrical Inspector finds a violation?
What must an Apple Valley electrical permit application include?
Sources & Official References
Other rules in Apple Valley
Compare Apple Valley to another location·View the Minnesota building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.