Bayonne, NJ Building Safety: Electrical Permits (2026)
Key Facts
- Reviewing official
- Electrical Subcode Official, Section 15-1.2
- Service fee, 0-100 amps
- $65
- Service fee, over 1,300 amps
- $775
- Fixtures fee
- $80 per block of 25
- Payment timing
- Due before Construction Official issues permit
Summary
In the City of Bayonne, an Electrical Subcode Official appointed under Section 15-1.2 reviews and permits electrical work as part of the Construction Agency's Uniform Construction Code process. Section 15-3.1b sets itemized fees for that permit, from $65 for a 0-to-100-amp service upgrade up to $775 for services over 1,300 amps.
§ 15-1.2. Qualifications for Official Positions. ... Each official position created in subsection 15-1.1 shall be filled by a person qualified for such position pursuant to N.J.S.A. 52:27D-119 et seq., and N.J.A.C. 5:23; provided that in lieu of any particular subcode official, an onsite inspection agency may be retained by contract pursuant to N.J.A.C. 5:23. ... ... b. Electrical Subcode Fees: 1 ... ... 2. Service, subpanel and motor control. (a) 0-100 amps - $65. (b) 101-299 amps - $150. (c) 300-399 amps - $220. (d) 400-999 amps - $575. (e) 1,000-1,299 amps - $675. (f) Over 1,300 amps - $775.
Full Breakdown
Bayonne's electrical permitting runs through the same State Uniform Construction Code framework as every other subcode. Section 15-1.2 requires the Electrical Subcode Official position created under Section 15-1.1 to be filled by someone qualified under N.J.S.A. 52:27D-119 and N.J.A.C. 5:23, and it allows the City to retain a contracted onsite inspection agency in lieu of a particular subcode official. Section 15-3.1b then itemizes the electrical permit fee schedule in detail: service, subpanel, and motor control work is charged by amperage, running $65 for 0 to 100 amps, $150 for 101 to 299 amps, $220 for 300 to 399 amps, $575 for 400 to 999 amps, $675 for 1,000 to 1,299 amps, and $775 above 1,300 amps.
Other line items in that same fee schedule cover fixtures and receptacles by the block of 25, air-conditioning units, generators sized by kilowatt, motors sized by horsepower, and transformers, so an electrician pulling a permit for a service upgrade, a new circuit, or added equipment pays the fee tied to that specific item. As with every other subcode, the full fee is due before the Construction Official issues the permit, and work commenced first draws a fine under the Uniform Construction Code.
Violations & Fines
Performing electrical work covered by Section 15-3.1b's fee schedule, such as a new service, subpanel, or generator installation, without first obtaining the Electrical Subcode permit exposes the property owner or contractor to the Uniform Construction Code fine for unpermitted work described in Section 15-3.1, plus the unpaid fee itself. Chapter 1's Section 1-5.1 general penalty of up to $1,250 or 90 days applies where no more specific penalty is set.
Frequently Asked Questions
Who reviews electrical permits in Bayonne?
How much is an electrical permit fee in Bayonne?
Can a licensed inspection agency stand in for the Electrical Subcode Official?
Sources & Official References
Other rules in Bayonne
Compare Bayonne to another location·View the New Jersey building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.