Adopted code
2014 Michigan Electrical Code (Detroit-amended)
Enforcing agency
BSEED Electrical Division
Permit required
Before any wiring, alteration, or addition
Homeowner exemption
Single-family owner-occupants may self-permit
Penalty basis
Fines under Code § 80.23.2

Summary

Detroit requires a written permit from the Buildings, Safety Engineering, and Environmental Department before wiring, altering, or adding electrical equipment, enforcing the 2014 Michigan Electrical Code that governs all electrical work citywide.

A person shall not equip a building with electrical conductors or equipment or make an alteration of, change in, or addition to, electrical conductors or equipment without receiving a written permit to do the work described. If the electrical installation or alterations of, changes in, or addition to, electrical conductors or equipment are found to be in compliance with the provision of the code and if the work has passed the inspection of the enforcing agency, then the enforcing agency shall, upon the request of the permit holder to whom the permit was issued, issue A certificate of final electrical inspection. The certificate certifies that the provisions of the code have been complied with. This section does not apply to installations that are referred to in section 7(3)(a), (b), (c), (d), (e), (f), (h), (k), (l), (m), or (o) of the Electrical Administrative Act, being MCL 338.887. A permit is required for all installations of a temporary nature that are governed by Article 590 of this code, Temporary Installations. A permit for inspection of electrical equipment for a carnival, convention display, parade, or street fair shall be issued and approval of the electrical equipment obtained prior to commencing of the carnival, convention display, parade, or street fair.

R 408.30818

80.19.1. To whom permits are issued.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 4).

Full Breakdown

The City of Detroit enforces the 2014 Michigan Electrical Code under Detroit City Code § 8-3-2, with the Buildings, Safety Engineering, and Environmental Department's Electrical Division issuing permits. Section 8-3-3 (Code § 80.19) bars anyone from wiring a building, or altering, changing, or adding to electrical conductors or equipment, without first obtaining a written permit. Permits go to licensed electrical contractors or their qualifying master electricians; a homeowner occupying a single-family home can self-permit under Section 80.19.1(1)(b) by filing a sworn affidavit. Completed work must pass inspection before the Department issues a certificate of final electrical inspection.

Violations & Fines

Working without a permit, or hindering an inspector, triggers a Notice of Violation and fines under Section 80.23.2; equipment found imminently dangerous can be disconnected or condemned on the spot.

Frequently Asked Questions

Do I need a permit to rewire my Detroit home?
Yes. Detroit City Code § 8-3-3 (2014 Mich. Electrical Code § 80.19) requires a written permit before any wiring, alteration, or addition to electrical conductors or equipment, issued by the Buildings, Safety Engineering, and Environmental Department.
Can a Detroit homeowner pull their own electrical permit?
Yes, if the home is a single-family residence the owner occupies. Under Section 80.19.1(1)(b) the owner can self-permit and self-install by filing a sworn affidavit with BSEED's Electrical Division confirming occupancy and ownership.

Sources & Official References

Other rules in Detroit

All Detroit rules

Compare Detroit to another location·View the Michigan building safety overview

Get notified when Electrical Permits in Detroit, MI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in Wayne County handle electrical permits.

Livonia, MI
Some Restrictions
Westland, MI
Some Restrictions
Dearborn, MI
Some Restrictions