Skip to main content
CityRuleLookup

Doña Ana County, NM Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Electrical code adopted
2020 NEC (National Electrical Code)
General rule
Electrical permit requires a building permit
Standalone permit exception
Service changes, small accessory buildings <=120 sq ft
Enforcing office
Building Services Department
Unpermitted-work penalty
Triple the original permit fee
Applies to
Unincorporated Doña Ana County only

Summary

Doña Ana County ties electrical permits to the 2020 National Electrical Code and generally bars issuing one without a validly issued building permit, with narrow exceptions for service changes, retrofits and small accessory buildings.

These county ordinances apply to unincorporated areas of Doña Ana County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

§ 142-5. Issuance of plumbing, mechanical, and electrical permits. A. No permit for plumbing, mechanical, or electrical work shall be issued unless in conjunction with a validly issued building permit, or in conjunction with an existing remodel not requiring a building permit... B. A permit for plumbing, mechanical, and/or electrical work may be issued without a building permit or mobile home installation permit when the work is limited to: (1) A service change for an existing building or mobile home... (7) An accessory building with an area of 120 square feet or less.

Full Breakdown

3 (Inspections) apply on top of the adopted electrical code. Fees are set under Chapter 179, Article VI per § 142-7, with valuation based on the ICC Building Safety Journal tables.

Violations & Fines

Performing electrical work without the required permit is enforceable under § 142-9, the Building Services Department's general enforcement authority, punishable under Chapter 1's general penalty at § 1-20 alongside any remedial action available under the adopted codes. § 179-19 adds a $45/hour investigation fee (one-hour minimum) for work begun without a permit, and triples the eventual permit fee as a penalty once the unpermitted work is discovered and a permit is required.

Frequently Asked Questions

Do I need a building permit to get an electrical permit in Doña Ana County?
Generally yes. § 142-5.A ties electrical permits to a validly issued building permit or mobile home installation permit for new construction, though § 142-5.B lists exceptions like service changes and small remodels.
Can I get a standalone electrical permit for a small shed?
Yes, if the accessory building is 120 square feet or less, § 142-5.B(7) allows an electrical permit without a separate building permit.
What electrical code does the county enforce?
The 2020 National Electrical Code, adopted at § 142-2, along with the New Mexico Electrical Code and New Mexico Electrical Safety Code amendments referenced in § 142-3.

Sources & Official References

Other rules in Doña Ana County

All Doña Ana County rules

Compare Doña Ana County to another location·View the New Mexico building safety overview

Get notified when Electrical Permits in Doña Ana County, NM changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.