Franklin, TN Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
NEC 2023 edition (NFPA)
Permit issuer
State of Tennessee
Exempt work
Minor repairs, no new wiring/devices
Enforcement
BNS electrical inspector
Appeal body
Building and Streets Standards Board of Appeals
Violation penalty
Fine per Appendix A, daily separate offense

Summary

Franklin adopts the National Electrical Code, 2023 edition, by reference for every electrical installation in the city, and Sec. 12-304 bars any electrical work until the State of Tennessee has issued a permit. Minor repairs that don't add new wiring, conduit, or devices are exempt. The Building and Neighborhood Services Department's electrical inspector enforces the code and can discontinue service to noncompliant work.

(1)Pursuant to authority granted by Tennessee Code Annotated, §§ 6-54-501 through 6-54-506, and for the purpose of providing practical minimum standards for the safeguarding of persons and of buildings and their contents from hazards arising from the use of electricity for light, heat, power, radio, signaling, or for other purposes, the National Electrical Code, 2023 edition, as prepared by the National Fire Protection Association, is hereby adopted and incorporated by reference as a part of this Code and is hereinafter referred to as the electrical code.(2)Pursuant to authority granted by Tennessee Code Annotated, § 6-54-502(c), the building and neighborhood services director shall adopt administrative regulations to incorporate subsequent amendments to the National Electrical Code, 2023 edition...unless disapproved by the board of mayor and alderman.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 30 Update 1).

Full Breakdown

' The city acts under authority granted by Tennessee Code Annotated §§ 6-54-501 through 6-54-506. Under TCA § 6-54-502(c), the Building and Neighborhood Services (BNS) director is authorized to adopt administrative regulations incorporating later NEC amendments, which take effect as TCA § 6-54-502 provides unless the board of mayor and aldermen disapproves them; a copy of the code with modifications is kept on file in the recorder's office (Sec. 12-303). Section 12-302 substitutes local officials for the code's generic terms: any NEC reference to 'enforcement' means the BNS Department, and any reference to 'Electrical Board' means the Building and Streets Standards Board of Appeals created in title 12, chapter 12.

Section 12-304 sets the permit rule: no electrical work may be done within the city until a permit has been issued by the State of Tennessee, though the term excludes minor repairs that don't involve installing new wire, conduits, machinery, apparatus, or other electrical devices generally requiring an electrician. The electrical inspector designated under state authority enforces compliance, may inspect wiring and equipment at reasonable times, and under Sec. 12-306 is authorized to refuse or discontinue electrical service to any person or place not complying with the chapter.

Sec. 12-307 lets the inspector collect the fees set in TCA § 68-102-143 and Appendix A, plus a reinspection fee if work fails inspection before it may resume.

Violations & Fines

Violating the electrical code is punishable by a fine set in Appendix A, Comprehensive Fees and Penalties (Sec. 12-305), and each day a violation continues counts as a separate offense. Beyond fines, the electrical inspector can refuse or discontinue electrical service to noncompliant work or property under Sec. 12-306, and reinspection fees apply before permitted work may continue once a project fails inspection.

Frequently Asked Questions

Do I need a permit for minor electrical repairs in Franklin?
No. Sec. 12-304 requires a state-issued permit for electrical work, but it excludes minor repairs that don't add new wire, conduit, machinery, or devices and that don't generally require an electrician. Anything beyond a minor fix, such as adding a circuit or replacing a panel, needs a permit issued by the State of Tennessee before work starts.
Which NEC edition applies to Franklin construction?
The 2023 edition of the National Electrical Code, adopted by reference under Sec. 12-301. The Building and Neighborhood Services director can incorporate later NFPA amendments through administrative regulation under TCA § 6-54-502(c), unless the board of mayor and aldermen disapproves them, so confirm the current file copy at the recorder's office.
What happens if electrical work fails inspection in Franklin?
The inspector notifies the permit holder or agent, and any reinspection required triggers a fee under Appendix A that must be paid before work continues, per Sec. 12-307. Under Sec. 12-306 the inspector may also refuse or discontinue electrical service to a noncompliant property until the violation is corrected.
Who hears appeals of Franklin electrical code decisions?
The Building and Streets Standards Board of Appeals, established in title 12, chapter 12. Sec. 12-302 specifies that wherever the NEC refers to an 'Electrical Board,' that reference means this board, which reviews building official and inspector determinations under the adopted codes.

Sources & Official References

Other rules in Franklin

All Franklin rules

Compare Franklin to another location·View the Tennessee building safety overview

Get notified when Electrical Permits in Franklin, TN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.