Key Facts

Fee schedule
§ 150-62(C), Electrical subcode fees
Base fee
$75 for first 50 receptacles/fixtures
Additional fixtures
$25 per 25 fixtures beyond 50
Motors/transformers 1-10 hp/kW
$25 each
Third-party inspection surcharge
25% municipal processing fee added
Default penalty
$2,000 fine or 90 days (§ 1-3)

Summary

Freehold Township charges electrical permit fees under § 150-62(C) of its Uniform Construction Code fee schedule, administered by the Electrical Subcode Official inside the Construction Division. Fees run per fixture, device or point, with the first fifty receptacles or fixtures billed at a flat $75.

§ 150-62. Uniform construction code (Chapter 115). ... [Amended 12-27-2005 by Ord. No. O-05-48; 4-28-2009 by Ord. No. O-09-11] ... C. Electrical subcode fees. [Amended 4-23-2013 by Ord. No. O-13-12; 5-24-2022 by Ord. No. O-22-7] (1) One to 50 receptacles or fixtures: $75; for each 25 receptacles or fixtures in addition to this, the fee is $25. For the purpose of computing this fee, receptacles or fixtures shall include lighting outlets, wall switches, fluorescent fixtures, convenience receptacles or similar fixtures, and motors or devices of less than one horsepower or one kilowatt.

Full Breakdown

Electrical work in Freehold Township is permitted and inspected by the Electrical Subcode Official, one of the four subcode positions Chapter 115's Construction Division comprises alongside the Construction Official, Building Subcode Official, Plumbing Subcode Official and Fire Protection Subcode Official. The fee table for that work sits in § 150-62(C), last amended May 24, 2022 by Ord. No. O-22-7. The base fee covers one to 50 receptacles or fixtures at $75, with an additional $25 for each 25 receptacles or fixtures beyond that, and the ordinance defines receptacles and fixtures broadly to include lighting outlets, wall switches, fluorescent fixtures, convenience receptacles or similar fixtures, and motors or devices of less than one horsepower or one kilowatt.

Larger equipment is billed separately: motors, transformers or generators between one and 10 horsepower or kilowatts cost $25 each. The schedule also prices out specific categories most homeowners will encounter during renovations: communication points ($65 for the first 25, $25 per additional 10) and alarm devices at a comparable tier structure. C. 20, plus a 25% municipal processing fee on top. As with all Chapter 115 permits, the Construction Official issues the permit only after § 115-5's fee is paid, and the technical wiring standards themselves come from the state electrical subcode, not from Freehold Township's own text.

Violations & Fines

Chapter 115 carries no electrical-specific penalty, so unpermitted electrical work falls to § 1-3's General Penalty: up to a $2,000 fine, 90 days imprisonment or 90 days community service, with each day of continued unpermitted work potentially a separate violation. Fee or classification disputes go to the Electrical Subcode Official or Construction Official.

Frequently Asked Questions

How much is an electrical permit in Freehold Township?
Section 150-62(C) charges $75 for the first 50 receptacles or fixtures, plus $25 for each additional 25. Larger equipment like motors, transformers or generators between one and 10 horsepower or kilowatts costs $25 each, and communication or alarm points are priced separately.
Who reviews electrical permit applications?
The Electrical Subcode Official, one of the subcode positions inside Chapter 115's Construction Division alongside the Construction Official and the Building and Plumbing Subcode Officials. All four report to the Construction Official as the Division's chief administrator.
What counts as a fixture for fee purposes?
The ordinance defines it broadly: lighting outlets, wall switches, fluorescent fixtures, convenience receptacles and similar fixtures, plus motors or devices under one horsepower or one kilowatt. Anything larger, like bigger motors, transformers or generators, is billed under a separate per-unit fee tier.
What if a third-party inspector reviews my electrical work instead of the Township?
The fee is still owed. Section 150-62(C)(5) bills third-party, on-site inspection agency work at the state's own rate under N.J.A.C. 5:23-4.20, plus an additional 25% for municipal processing, so third-party review does not reduce the total cost.

Sources & Official References

Other rules in Freehold Township

All Freehold Township rules

Compare Freehold Township to another location·View the New Jersey building safety overview

Get notified when Electrical Permits in Freehold Township, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in this county handle electrical permits.

Long Branch, NJ
Some Restrictions