Freehold Township, NJ Building Safety: Plumbing Permits (2026)
Key Facts
- Fee schedule
- § 150-62(B), Plumbing subcode fees
- Standard fixtures
- $25 each (sinks, toilets, tubs, etc.)
- Heavier equipment
- $75-$150 each (heaters, boilers, connections)
- Minimum permit fee
- $75 per § 150-62(B)(4)
- Third-party inspection surcharge
- 25% municipal processing fee added
- Default penalty
- $2,000 fine or 90 days (§ 1-3)
Summary
Freehold Township prices plumbing permits per fixture under § 150-62(B) of its Uniform Construction Code fee schedule, administered by the Plumbing Subcode Official. Standard fixtures like sinks, toilets and water heaters run $25 to $75 each, with a flat $75 minimum on every plumbing permit.
§ 150-62. Uniform construction code (Chapter 115). ... [Amended 12-27-2005 by Ord. No. O-05-48; 4-28-2009 by Ord. No. O-09-11] ... B. Plumbing subcode fees. [Amended 4-23-2013 by Ord. No. O-13-12; 5-24-2022 by Ord. No. O-22-7] (1) Total number of fixtures and stacks, including but not limited to all sinks, urinals, water closets, bathtubs, shower stalls, laundry tubs, floor drains, drinking fountains, dishwashers, garbage disposals, clothes washers, hot water heaters or similar devices: $25 each.
Full Breakdown
Plumbing work in Freehold Township is reviewed and inspected by the Plumbing Subcode Official, one of Chapter 115's four subcode positions under the Construction Official. The applicable fees sit in § 150-62(B), Plumbing subcode fees, last amended May 24, 2022 by Ord. No. O-22-7. Most household fixtures, water closets, bidets, urinals, bathtubs, lavatories and sinks, showers, floor drains, washing machines, dishwashers, hose bibs, water coolers and garbage disposals, are charged a flat $25 each. Heavier equipment costs more: water heaters, sewer ejectors, backflow devices, boilers, gas service connections, fuel oil piping and sump pumps run $75 each, water and sewer utility connections cost $150 each, and grease traps, interceptors, air-conditioning units and reduced-pressure backflow devices are $65 each.
Active solar system connections are also billed at $75. C. 20 plus a 25% municipal processing surcharge when a private, on-site agency rather than the Township inspects the work. As with every Chapter 115 permit, § 115-5 requires the fee to be paid before the Construction Division issues the permit, and the actual plumbing code requirements themselves, pipe sizing, venting, fixture units, come from the state's adopted plumbing subcode rather than from Township text.
Violations & Fines
Chapter 115 has no plumbing-specific penalty clause, so unpermitted plumbing work is punished under § 1-3's General Penalty: up to $2,000, 90 days imprisonment, or 90 days community service, with each day of continued unpermitted work potentially charged as a separate violation. Fee and classification disputes are resolved by the Plumbing Subcode Official.
Frequently Asked Questions
How much does a plumbing permit cost in Freehold Township?
Who reviews plumbing permit applications in Freehold Township?
Does a solar water heater need a plumbing permit?
What happens if I use a private inspector instead of the Township's?
Sources & Official References
Other rules in Freehold Township
Compare Freehold Township to another location·View the New Jersey building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Plumbing Permits in Nearby Cities
How other cities in this county handle plumbing permits.