Skip to main content

Georgetown, KY Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified November 2026

Key Facts

Adopted code
National Electrical Code, 2014 edition (NFPA 70)
Permit from
The building official, under Section 8-2(a)
Notice to building official
Before work starts and when ready for inspection
Before current is furnished
Electrical inspector's certificate of approval
Correction period for existing violations
30 days before service can be disconnected
Inspections performed by
State-certified electrical inspectors

Summary

Georgetown adopts the National Electrical Code, 2014 edition (NFPA 70), by reference. Electrical work needs a permit from the building official under Section 8-2, the installer must notify the building official before starting and when the work is ready for inspection, and no one can furnish current until the electrical inspector approves the installation and issues a certificate of approval.

The National Electrical Code, 2014 edition, also known as the NFPA 70, is hereby adopted by reference as if copied in full and set forth herein. ... It shall be the duty of the person installing electrical wiring or equipment, or repairing or rearranging same, to notify the building official prior to the time the work is commenced, and also when the work is ready for inspection, and it shall be unlawful for any person to conceal any such electrical wiring or installations until after same has been reported to the building official, and has been inspected and approved by the building official. ... It shall be unlawful for any person, including any electric light or power company, to connect with or furnish current to any electrical installation within the corporate limits of the city until after such electrical installation shall have been inspected and approved by the electrical inspector, and a certificate of approval issued by him.

View official code

Official source re-checked November 3, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 4).

Full Breakdown

Section 8-57 adopts the National Electrical Code, 2014 edition, also known as NFPA 70, by reference as if copied in full and set forth in the Code. Section 8-58 sets the working standard: all electrical wiring in the city, when installed to be connected to a source of electrical energy, must be sufficiently insulated, supported and protected to be reasonably free from hazards to life and property caused by over-loading, short-circuiting and improper protection or installation of electrical equipment, and must comply fully with the National Electrical Code and the National Electrical Safety Code.

The permit requirement sits in Section 8-2(a), which requires any owner, authorized agent or contractor who desires to insert items such as heating, electrical, etc., to apply to the building official first and obtain the required permit. Fees follow the schedule kept by the city clerk under Section 8-34. Section 8-32 says all electrical inspections are performed by persons certified by the state department of housing, buildings and construction as an electrical inspector, and Section 8-59 authorizes the council to contract with private electrical inspection firms.

Inspection timing is fixed by Section 8-60. The person installing, repairing or rearranging wiring or equipment must notify the building official before the work is commenced and again when it is ready for inspection, and no one can conceal wiring until it has been reported, inspected and approved. Under Section 8-61, nobody, including an electric light or power company, can connect with or furnish current to an installation until the electrical inspector has approved it and issued a certificate of approval.

For existing wiring, Section 8-63 has the electrical inspector inspect on complaint by an occupant or request by an owner. On finding a violation that creates a threat of bodily injury or property damage, the inspector gives the owner 30 days to correct it, provides reasonable assistance, and if there is no substantial progress at the end of 30 days can cause service to be disconnected without further notice. For an imminent threat of serious bodily injury or substantial property damage, the 30-day period can be waived. The fire chief or a designee can cut off electrical currents in emergencies.

Violations & Fines

Failure to comply with the wiring standard is prima facie evidence of a violation of the electrical article under Section 8-58(b). Concealing wiring before inspection and approval violates Section 8-60, and connecting current before the certificate of approval violates Section 8-61. The inspector can disconnect service under Section 8-63 when a threat is not corrected, and Section 2-843 lets a code enforcement officer order work stopped. Section 2-842 caps civil fines for provisions the Code Enforcement Board enforces at $2,000.00 contested and $1,000.00 uncontested.

Frequently Asked Questions

Which electrical code does Georgetown enforce?
Section 8-57 adopts the National Electrical Code, 2014 edition, also known as NFPA 70, by reference. Section 8-58(b) also requires full compliance with the National Electrical Safety Code and the standards of safety adopted by the state department of insurance, division of fire prevention and rates. Failure to comply is prima facie evidence of a violation.
Do I need a permit for electrical work in Georgetown?
Section 8-2(a) requires any owner, authorized agent or contractor who desires to insert items such as heating, electrical, etc., to apply to the building official and obtain the required permit first. The application goes to the building official with the fee from the schedule held by the city clerk.
When does the power company get to turn the power on?
Section 8-61 makes it unlawful for any person, including an electric light or power company, to connect with or furnish current to an electrical installation within the city until it has been inspected and approved by the electrical inspector and a certificate of approval has been issued.
What happens if my existing wiring is found unsafe?
Under Section 8-63, the electrical inspector notifies the owner of a violation that threatens injury or damage and gives 30 days to correct it, with reasonable assistance. If the owner has made no substantial progress by then, service can be disconnected without further notice. For an imminent threat the inspector can waive the 30 days and disconnect on notice.

Sources & Official References

Other rules in Georgetown

All Georgetown rules

Compare Georgetown to another location·View the Kentucky building safety overview

Get notified when Electrical Permits in Georgetown, KY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.