Lakewood, NJ Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Minimum electrical fee
$65.00
Fixtures 1-25
$65.00 flat
Each additional fixture
$10.00
Service panel 1-225 amps
$50.00
Reinstatement of lapsed permit
$50.00 flat

Summary

Lakewood charges a minimum $65 Electrical Subcode fee for any wiring permit, with additional per-item charges for extra fixtures, motors, transformers and service panels above set thresholds, all paid before the permit issues.

Electrical Subcode Fee. The Electrical Subcode Fee shall be as set forth in the following schedule: Minimum Electrical Subcode Fee shall be $65.00 1. Fixtures or receptacles (receptacles and fixtures shall include lighting outlets, wall switches, electrical discharge fixtures, convenience receptacles or similar fixtures, and motors or devices of less than one horsepower or one kilowatt, burglar, fire, and communication devise, etc.): 1—25 $65.00 Each additional $10.00 4. Service panels, service entrance of subpanel (each): 1—225 amperes $50.00 Greater than 225 amperes to 600 amperes $100.00 Greater than 600 amperes to 1,000 amperes $200.00 Greater than 1,000 amperes $450.00

Full Breakdown

Township of Lakewood Code § 12-2.1c sets the Electrical Subcode fee schedule administered by the Division of Construction Code Enforcement. The minimum Electrical Subcode fee is $65.00, which covers the first 25 fixtures or receptacles, defined broadly to include lighting outlets, wall switches, electrical discharge fixtures, convenience receptacles, and motors or devices under one horsepower or one kilowatt, plus burglar, fire and communication devices; each additional fixture beyond 25 adds $10.00. Motors and electrical devices are billed per unit on a sliding scale from $15.00 (1 to 10 horsepower) up to $450.00 for anything over 1,000 horsepower, and transformers and generators follow a parallel scale from $15.00 (1 to 10 kilowatts) to $200.00 above 112.5 kilowatts.

Service panels, service entrances or subpanels are charged $50.00 for 1 to 225 amperes, rising to $450.00 for installations exceeding 1,000 amperes. The code directs that, for computing these fees, all motors except those built into plug-in appliances must be counted, along with control equipment, generators, transformers and other current-consuming or current-generating devices. A lapsed electrical permit can be reinstated for a flat $50.00, meter resets are priced by service size, and a real estate resale inspection carries a separate $20.00 fee. These fees are paid before the permit issues, consistent with the overall construction permit fee rule in § 12-2.1.

Violations & Fines

Electrical work performed without the required Electrical Subcode permit is subject to Lakewood's general penalty under Township of Lakewood Code § 1-5.1: a fine of up to $1,000, up to 90 days in county detention, or up to 90 days of community service, with each day of continuing violation treated as a separate offense under § 1-5.5.

Frequently Asked Questions

How much is an electrical permit in Lakewood Township for a few outlets?
The minimum Electrical Subcode fee is $65.00, which covers up to 25 fixtures or receptacles including outlets and wall switches. Each additional fixture beyond 25 adds $10.00, per Township of Lakewood Code § 12-2.1c.
What does a service panel upgrade permit cost in Lakewood?
A new or upgraded service panel, service entrance, or subpanel is charged $50.00 for 1 to 225 amperes, rising through tiers to $450.00 for installations over 1,000 amperes, under § 12-2.1c.
Is there a fee for a resale electrical inspection in Lakewood?
Yes. Township of Lakewood Code § 12-2.1c sets a $20.00 fee for a real estate inspection performed in connection with a resale, separate from the standard construction permit fees.
Can I reinstate an expired electrical permit in Lakewood?
Yes, for a flat $50.00 reinstatement fee under § 12-2.1c, though the general construction permit rules in § 12-2.1 still require payment before the reinstated permit is issued.

Sources & Official References

Other rules in Lakewood

All Lakewood rules

Compare Lakewood to another location·View the New Jersey building safety overview

Get notified when Electrical Permits in Lakewood, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in this county handle electrical permits.

Brick, NJ
Some Restrictions
Toms River, NJ
Some Restrictions