Key Facts

Governing code
Virginia USBC, adopted by § 11.1-1
0-200 amp permit fee
$50
201-400 amp permit fee
$100
Per-circuit fee (first 100)
$3 per circuit
Surcharge on all fees
2% plus $15 processing
Discontinued service reinspection
Required after 90+ days

Summary

Norfolk regulates electrical work through the Virginia Uniform Statewide Building Code, adopted citywide by City Code § 11.1-1, and charges permit fees by amperage and circuit count under the Electrical Fee Schedule in § 11.1-3. Discontinued residential service must be reinspected before restoration.

Electrical Fee Schedule Electrical Service (Single-Phase or Three Phases) 0—200 AMP $50 201—400 AMP $100 401—600 AMP $150 Each additional 100 AMP up to 1000 AMP $25 Each additional 100 AMP over 1000 AMP without limit $50

For each piece of equipment and each circuit or feeder installed, extended, relocated, or repaired $3 per circuit up to 100 circuits, then $4 per circuit... The code official shall require reinspection before service may be restored to a residential electrical installation from which electrical service has been discontinued for a period of ninety (90) days or more, and prior to reconnection of any change in service to a commercial installation.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 166).

Full Breakdown

1. 1-3 charges permit fees on a sliding scale by service size: $50 for 0-200 amp single- or three-phase service, $100 for 201-400 amp, $150 for 401-600 amp, then $25 for each additional 100 amps up to 1,000 amps and $50 for each additional 100 amps beyond that. Work involving individual pieces of equipment or circuits is billed per circuit or feeder installed, extended, relocated, or repaired: $3 per circuit for the first 100 circuits, then $4 per circuit thereafter. Miscellaneous electrical work carries its own fees: pool grounding is $50, a temporary release is $50, and a temporary electrical construction pole permit is $50.

1-3 to fund Building Code Academy training as required by Va. Code § 36-137, plus a flat $15 processing charge. 1 requires the code official to reinspect a residential electrical installation before service can be restored once it has been discontinued for 90 days or more, and requires reinspection before reconnecting any change in service to a commercial installation. Property owners who let service lapse past that 90-day mark cannot simply flip the power back on; they must schedule and pass a code official inspection first.

Working without an electrical permit exposes an owner or contractor to the administrative fee for work begun without a permit, separate from the underlying electrical permit fee itself.

Violations & Fines

Performing electrical work without the required permit triggers a $150 administrative fee for work begun without a permit, on top of the underlying electrical permit fee, under the § 11.1-3 fee schedule. General USBC violations are enforceable by the code official under § 11.1-2.1, and unpermitted or noncompliant work can be ordered corrected or abated, with costs charged back to the responsible party. Reconnecting an electrical service after a 90-day-plus discontinuance, or changing commercial service, without the reinspection required by § 11.1-11.1 leaves the installation out of compliance until the code official signs off.

Frequently Asked Questions

Does Norfolk require a permit for electrical work?
Yes. Electrical installations fall under the Uniform Statewide Building Code as adopted by City Code § 11.1-1, and the code official's office charges a permit fee under the Electrical Fee Schedule in § 11.1-3, scaled by amperage or by the number of circuits involved in the job.
How much does an electrical permit cost in Norfolk?
Base fees run from $50 for 0-200 amp service up to $150 for 401-600 amp service, with $25 to $50 added per additional 100 amps beyond that. Per-circuit work is billed at $3 per circuit for the first 100 circuits and $4 per circuit after that, plus a 2% Building Code Academy surcharge and a $15 processing fee.
Can I turn electrical service back on myself after it was shut off for months?
No. Under § 11.1-11.1, the code official must reinspect a residential installation before service is restored once it has been discontinued 90 days or more, and must reinspect before any change in service is reconnected to a commercial building.

Sources & Official References

Other rules in Norfolk

All Norfolk rules

Compare Norfolk to another location·View the Virginia building safety overview

Get notified when Electrical Permits in Norfolk, VA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.