Summary
Oak Lawn requires an electrical inspector-issued permit before any electrical equipment is installed or altered, and enforces the 2018 Chicago Electrical Code, based on the 2017 NEC, as its wiring standard.
No electrical equipment shall be installed or altered except upon a permit first issued by the electrical inspector authorizing the installation, alteration, use or repair of electrical equipment.
2. Where an electrical installation has been started prior to the issuance of a permit for such work, the permit fee for such work shall be twice the amount of the normal permit fee prescribed in this chapter but no permit fee shall exceed the normal permit fee for such work plus two hundred fifty dollars ($250.00).
3. Where a registered electrical contractor is found doing electrical work without a permit on three (3) separate occasions in one calendar year, a hearing shall be held by the director of the office of quality control, at which time the permit privileges of said electrical contractor may be suspended for a period of time not to exceed one year.
B. Application For Permit:
1. No permit for the installation, alteration, repair or use of electrical equipment shall be issued except pursuant to an application therefor made out on a printed form, to be furnished by the electrical inspector, or his duly authorized deputy, and upon payment of a fee in advance as hereinafter provided.
2. The application for each permit shall contain the name of the owner, or user of electrical equipment to be installed, altered, repaired or used, and the location of the premises where such installation or alteration is to be
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-15: Code current through: Ord. 26-09-22, passed April 28, 2026).
Full Breakdown
The Village of Oak Lawn requires a permit from its electrical inspector before any electrical equipment is installed, altered, repaired or used (§ 6-2-5(A)(1)). Starting work before the permit issues doubles the permit fee, capped at the normal fee plus $250, and a registered contractor caught working without a permit three times in one calendar year faces a suspension hearing of up to a year (§ 6-2-5(A)(2)-(3)). The underlying standard is the 2018 Edition of the Chicago Electrical Code, based on the 2017 National Electrical Code, adopted with local amendments (§ 6-2-3).
Violations & Fines
Working without a permit doubles the fee (capped at fee plus $250); a contractor caught unpermitted three times in a year faces a suspension hearing of up to one year.
Frequently Asked Questions
Do I need a permit for electrical work in Oak Lawn?
What electrical code does Oak Lawn use?
What if I start electrical work before getting a permit?
Sources & Official References
Other rules in Oak Lawn
Compare Oak Lawn to another location·View the Illinois building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in Cook County handle electrical permits.