Key Facts

Adopted code
2020 NEC (NFPA 70), 2021 NFPA 73
Permit fee threshold
$10 or more per RCMC 15.16.020
Exempt work
Single 30-amp circuit by licensed contractor
Homeowner permit
Valid 6 months from date of last inspection
Temporary installs
Capped at 180 days without re-inspection

Summary

Rapid City has adopted the 2020 National Electrical Code, and Section 15.16.020's Administration and Enforcement provisions require anyone doing electrical work to secure a permit first, with permits required for fees of $10 or more, except for a single 30-amp circuit installed by a licensed electrical contractor.

There is adopted by the City of Rapid City, for the purpose of prescribing regulations for the practical safeguarding of persons and property from hazards arising from the use of electricity, that certain code known as the National Electrical Code (NEC), as recommended by the National Fire Protection Association (NFPA), specifically the 2020 edition thereof, also known as NFPA 70 ... and these are adopted by reference as though fully set forth herein. ... ... A. Permit Required. Before commencing any electrical work within the purview of this chapter, the person intending to do such work must first make application to the City of Rapid City for a permit pursuant to Chapter 15.04; provided, however, no permit shall be required for the installation, alteration or removal of a single 30-amp circuit or less, if such circuit is installed, altered or removed by an Electrical Contractor holding the appropriate license issued pursuant to this chapter. A permit is required for fees equal to or greater than $10 or as otherwise provided by resolution of the Common Council.

Full Breakdown

010 adopts the National Electrical Code, NFPA 70, specifically the 2020 edition, along with NFPA 73, the Residential Electrical Maintenance Code for One and Two Family Dwellings, 2021 Edition, for inspecting existing commercial and residential services. 12, that governs how that code is enforced in the city. 04, though no permit is required for installing, altering, or removing a single 30-amp circuit or less if a licensed Electrical Contractor does the work, and any other permit is required whenever the fee reaches $10 or more or as otherwise set by Common Council resolution.

4: an owner-occupant may wire their own single-family residence, accessory structure, or mobile home without pay to anyone else, but must file plans, demonstrate code knowledge to the city, obtain a permit, pay fees, and call for inspections, and that homeowner permit is only valid for six months from the date of the last inspection. 11 caps temporary electrical installations at 180 days without a re-inspection.

Violations & Fines

Subsection 80.4(B) makes it unlawful for any person to engage in the business of electrical installation, or perform or offer to perform electrical work in the city, without a current license, and subsection 80.7(E) authorizes the inspector to void an installation or order a disconnect if an owner or installer refuses to make corrections or fails to pay fees owed. Energizing wiring before a final certificate of approval is issued is also a violation under subsection 80.6.

Frequently Asked Questions

Do I need a permit for electrical work in Rapid City?
Yes, generally. Subsection 80.6 of Section 15.16.020 requires an application to the city for a permit before starting electrical work, though a single 30-amp circuit or less installed by a licensed Electrical Contractor is exempt, and permits are required once the fee reaches $10 or more.
Can I wire my own house myself?
Yes, under the homeowner exception in subsection 80.4. You must own and occupy the single-family residence or accessory structure, do the work yourself without paying anyone else, file plans, show the city you understand the code, get a permit, and call for inspections.
How long is a homeowner electrical permit good for?
A homeowner permit issued under subsection 80.4 is valid for six months from the date of the last inspection performed on the job.
What NEC edition does Rapid City enforce?
Section 15.16.010 adopts the 2020 edition of the National Electrical Code, NFPA 70, along with the 2021 edition of NFPA 73 for inspecting existing one- and two-family dwelling services.

Sources & Official References

Other rules in Rapid City

All Rapid City rules

Compare Rapid City to another location·View the South Dakota building safety overview

Get notified when Electrical Permits in Rapid City, SD changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.