Summary
Rapid City requires every phase of permitted construction to pass inspection by the Building Official before work continues. Under Rapid City Municipal Code § 15.04.260, the permit holder must request each inspection at least one working day ahead, and § 15.04.280 lists the required inspection stages, from footing and framing through the final inspection before occupancy. If work is not ready when the inspector arrives, § 15.04.290 lets the Building Official charge a reinspection fee.
A. It shall be the permit holder or permit holder’s agent to notify the Building Official that such work is ready for inspection. The Building Official may require that every request for inspection be filed at least 1 working day before such inspection is desired. Such a request may be in any form approved by the Building Official. ... ... 1. Footing inspection: To be made after excavations for footings are complete and any required reinforcing steel and form work is in place. Setbacks from property lines, adequate soil conditions, and footing depth, width and location shall be verified. ... ... 8. Final inspection: To be made after the building and finish grading is completed and ready for occupancy or use. Exemptions for weather allowed. ... If a second inspection is needed because the work was not ready for inspection, and if the work is also not ready for the second inspection, the Building Official shall charge a reinspection fee.
Full Breakdown
260 makes it the permit holder's or their agent's duty to notify the Building Official when work is ready for inspection, filing the request at least one working day before the desired inspection date in whatever form the Building Official approves; the contractor who performed the work must also provide access for the inspection, with approved plans on site. 280 lists the inspections the Building Official may require on a permit: footing inspection after excavation and reinforcing steel are in place, checking setbacks, soil conditions and footing depth; foundation drain and ufer ground inspections; framing inspection once framing, fire blocking, bracing, roofing, and rough electrical, plumbing and heating work are complete; fire caulking and firewall inspections at framing stage; an ice barrier inspection; and a final inspection after the building and grading are finished and ready for occupancy, with weather exemptions allowed. 270. 290 authorizes the Building Official to charge a reinspection fee, and no further inspection proceeds until that fee is paid.
Violations & Fines
Covering or concealing reinforcing steel, structural framing, or other work before the Building Official approves the corresponding inspection violates § 15.04.270 and § 15.04.300, and can require the work to be uncovered for inspection at the permit holder's expense. Buildings erected without one or more of the required inspections may be classed as an unlawful structure and pursued under the International Property Maintenance Code, and any violation of Title 15.04 carries the general penalty of § 1.12.010: $1 to $500, up to 30 days in jail, or both.
Frequently Asked Questions
How much notice do I need to give for a Rapid City building inspection?
What inspections does Rapid City require during construction?
What happens if my work is not ready when the inspector shows up in Rapid City?
Sources & Official References
Other rules in Rapid City
Compare Rapid City to another location·View the South Dakota building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.