Santa Fe, NM Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- 2020 NM Electrical Code (NEC), NMAC 14.10.4
- Permit issuance fee
- $40.00 flat
- Residential 100-amp meter loop fee
- $45.00
- Commercial over-2,000-amp panel fee
- $900.00
- No-permit penalty
- double the original fee
- Records on file at
- office of building inspections
Summary
Santa Fe enforces electrical work through the 2020 New Mexico Electrical Code, adopted by reference in Section 7-1.1(A)(14) SFCC 1987, which incorporates the National Electrical Code as amended by the state construction industries division. A permit and a $40 issuance fee are required before wiring work begins, with panel-specific fees added under Table 7-1.11-1.
A.For the purpose of regulating the erection, construction, enlargement, alteration, repair, moving, removal, conversion, demolition, occupancy, equipment, use, height, area, unobstructed maintenance of required yards, and maintenance of buildings or structures within the planning and platting jurisdiction of the city, the following provisions and codes are adopted by reference and incorporated as fully as if set out herein unless otherwise amended by the city:...(14)2020 New Mexico Electrical Code adopted by the state of New Mexico construction industries division (NMAC 14.10.4), as may be amended from time to time, which adopts and amends the National Electrical Code (NEC); and
Full Breakdown
4), which adopts and amends the National Electrical Code (NEC). 1(D). Paragraph B makes noncompliance with any adopted code enforceable under Sections 1-3 and 14-11 SFCC 1987, and paragraph C requires a copy of the adopted codes to be kept on file in the office of building inspections for public review. 00 for panels over 2,000 amps. Temporary power poles, mobile home service and low-voltage work each carry their own listed fee in the same table.
Violations & Fines
Performing electrical work without the permit required under the adopted 2020 NM Electrical Code, or without paying the fees in Table 7-1.11-1, is enforceable under Sections 1-3 and 14-11 SFCC 1987, the penalty sections referenced in Section 7-1.1(B). Building without a permit doubles the original permit fee under the Table 7-1.11-1 administrative fee schedule.
Frequently Asked Questions
What electrical code does Santa Fe use?
How much does an electrical permit cost in Santa Fe?
What happens if I do electrical work without a permit?
Sources & Official References
Other rules in Santa Fe
Compare Santa Fe to another location·View the New Mexico building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.