Skip to main content
CityRuleLookup

Seattle, WA Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
2023 NEC + WAC 296-46B (SMC 22.101.010)
Enforcing agency
Seattle Dept. of Construction & Inspections
Min. self-issued permit fee
$105.12 (OTC electrical permit)
Late renewal fee
1/2 base fee after 1 year
Civil penalty
$27/day for unpaid permit fees

Summary

Seattle enforces its own Electrical Code, the 2023 National Electrical Code plus selected portions of WAC 296-46B, adopted by SMC 22.101.010 with local amendments in Attachment C, and requires an SDCI electrical permit for wiring installations, additions, and alterations. SMC 22.900D.150 charges permit fees on a valuation basis when plans are reviewed, or from a flat fee table when they are not, with a $105.12 minimum self-issued permit.

Permit fees for electrical installations for which plans and specifications are reviewed by the Director shall be charged on a valuation basis as set forth in Table D-14 for 22.900D.150.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Municipal Code: Supplement 44 Update 1).

Full Breakdown

1. Temporary electrical installations are billed for services only. 12, and a single-family dwelling electrical permit does not require additional fees for voice, audio, or data wiring except security systems, which do require a separate fee. 4. Electrical permits may be renewed for 1/4 the SDCI base fee if renewed within 30 days before expiration or up to one year after, rising to 1/2 the base fee for renewals filed more than a year late. 010).

Violations & Fines

Proceeding with wiring work before an electrical permit fee is paid is unlawful under SMC 22.900A.070, and SDCI may post a stop-work order on the property. Fees unpaid 30 days after billing accrue 12 percent annual interest under SMC 22.900A.060, and SMC 22.900A.080 authorizes a $27-per-day civil penalty, enforced by the City Attorney in Seattle Municipal Court.

Frequently Asked Questions

What electrical code edition applies in Seattle?
Seattle's Electrical Code is the 2023 National Electrical Code together with selected portions of WAC chapter 296-46B, adopted by SMC 22.101.010 with a locally amended Article 80 in Attachment C, filed with the City Clerk under Clerk File 323099.
How much does a Seattle electrical permit cost?
Cost is set by SMC 22.900D.150: permits with plan review are charged on the value of labor and materials per Table D-14, while installations not needing plans use the flat Table D-15 schedule, with a $105.12 minimum for a standard self-issued Online Trade-Construction permit.
Do single-family homeowners pay extra for low-voltage wiring?
No. A single-family dwelling electrical permit does not require additional fees for voice, audio, or data systems, except security systems, which do require their own permit fee, under footnote 1 to Table D-15 for SMC 22.900D.150.

Sources & Official References

Other rules in Seattle

All Seattle rules

Compare Seattle to another location·View the Washington building safety overview

Get notified when Electrical Permits in Seattle, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in King County handle electrical permits.

Renton, WA
Some Restrictions
Kirkland, WA
Some Restrictions
Kent, WA
Some Restrictions
Bellevue, WA
Some Restrictions
Federal Way, WA
Some Restrictions
Auburn, WA
Few Restrictions