Shelby County, TN Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
2020 National Electric Code (NEC)
Permit appendix
Appendix A, Electrical Permit & Inspection Fees
Joint name
2021 Memphis and Shelby County Electrical Code
Local amendments
Joint Ordinance No. 528
Effective date
December 31, 2021

Summary

Unincorporated Shelby County requires electrical work to follow the 2020 National Electric Code, adopted by reference and packaged with a locally drafted Appendix A covering electrical permits and inspection fees. Together these form the 2021 Memphis and Shelby County Electrical Code, effective December 31, 2021.

City-specific rules exist: Memphis has its own electrical permits rules that differ from Shelby County's county-level regulations. If you live in Memphis, check the city-specific page instead.

The 2020 edition of the National Electric Code (NEC) is hereby adopted by reference as if set out in its entirety herein. ... The 2020 edition of the National Electric Code (NEC) and those local amendments attached to Joint Ord. No. 528, Exh. B, including certain amendments to the NEC and locally drafted Appendix A--Electrical Permit and Inspection Fees, as herein set forth in exhibit A hereto, are also adopted and together these provisions and the 2020 NEC shall be known as the 2021 Memphis and Shelby County Electrical Code.

Full Breakdown

Shelby County Code § 6-73 adopts the 2020 edition of the National Electric Code (NEC) by reference in its entirety for the unincorporated county. Section 6-74 layers on local amendments attached to Joint Ordinance No. 528, and § 6-75 incorporates the 2020 NEC, those local amendments, and a locally drafted Appendix A, Electrical Permit and Inspection Fees, by reference; together the NEC and these local additions are named the 2021 Memphis and Shelby County Electrical Code. Because Appendix A is the section that sets electrical permit and inspection fees, anyone doing wiring, panel or service work outside Memphis, Bartlett, Collierville, Germantown, Millington, Arlington or Lakeland pulls an electrical permit under that adopted appendix rather than a stand-alone county ordinance.

Section 6-76 sets the effective date at December 31, 2021, contingent on concurring passage by the Memphis City Council and the Shelby County Board of Commissioners or, if the two bodies act on different dates, on the date of the later adoption. The code cross-references gas and electric utility services at Chapter 8, Article VIII. Inspections of electrical work fall to the county electrical inspector created under § 6-2, or to a contracted city electrical inspector serving as an ex officio county inspector under the same section.

Violations & Fines

Violations of the electrical code, like other Chapter 6 construction-code violations, are fined not more than $50.00 per offense under Sec. 6-5, and the county attorney or county electrical inspector can seek an injunction or abatement order under Sec. 6-6 against work that fails to meet the adopted NEC standards.

Frequently Asked Questions

What electrical code applies in unincorporated Shelby County?
The 2020 National Electric Code, adopted by reference at Shelby County Code § 6-73, plus local amendments and a locally drafted Appendix A on electrical permits and inspection fees under § 6-75.
Do I need a separate electrical permit from my building permit?
Yes. Electrical permit and inspection fees are set under the adopted NEC's Appendix A, incorporated at § 6-75, separately from the building permit fees tied to the IBC's own Appendix A.
When did the current electrical code take effect?
December 31, 2021, per § 6-76, once the Memphis City Council and the Shelby County Board of Commissioners both passed the joint ordinance.
Who inspects electrical work in the unincorporated county?
The county electrical inspector created under § 6-2, or a city electrical inspector the county has contracted with to serve as an ex officio county inspector.

Sources & Official References

Other rules in Shelby County

All Shelby County rules

Compare Shelby County to another location·View the Tennessee building safety overview

Get notified when Electrical Permits in Shelby County, TN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Cities Across Shelby County