Key Facts

Adopted code
2025 California Electrical Code
Base standard
2023 National Electrical Code (NFPA)
Local amendment
New § 110.5.1 aluminum wiring inspection
Adopting ordinance
Ord. 2629, 11/12/2025
Enforcing office
Westminster Building Official

Summary

Westminster regulates all electrical wiring, fixture and appliance installation citywide under the 2025 California Electrical Code, based on the 2023 National Electrical Code. Section 15.12.010 makes that code the city's electrical code, and any wiring, alteration or repair work on premises within city limits must meet it and go through the Building Official's permit process.

Except as provided in this chapter, the 2025 Edition of California Electrical Code, based on the 2023 National Electrical Code as published by the National Fire Protection Association, shall be the electrical code of the city, regulating all installation, arrangement, alteration, repair, use and other operation of electrical wiring, connections, fixtures and other electrical appliances on premises within the city. The California Electrical Code is on file for public examination in the office of the building official.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4982734; v10 updated 2026-06-10).

Full Breakdown

010, adopts the 2025 Edition of the California Electrical Code, itself based on the 2023 National Electrical Code published by the National Fire Protection Association, as the electrical code governing the city. The adopted code regulates the installation, arrangement, alteration, repair, use and other operation of electrical wiring, connections, fixtures and other electrical appliances on any premises within Westminster, and a copy is kept on file for public examination in the office of the Building Official. 1, Continuous inspection of aluminum wiring, which lets the Building Official approve aluminum wiring only where adequate safety measures can be ensured, and requires that aluminum conductors of No.

6 gauge or smaller used for branch circuits receive continuous inspection by an independent testing agency approved by the Building Official to confirm proper torque at their termination points. Both provisions were adopted by Ordinance 2629 on November 12, 2025. Because the Electrical Code is folded into Title 15's Building Code family rather than issued as a standalone rule, electrical work in Westminster is permitted and inspected through the same Building Division process as other construction trades, and any wiring project must be reviewed against the 2025 California Electrical Code as amended before the Building Official signs off.

Violations & Fines

Electrical work performed without a permit, or that fails to meet the 2025 California Electrical Code as adopted and amended by Sections 15.12.010 and 15.12.020, does not pass Building Official inspection and cannot receive final sign-off or a certificate of occupancy. Unapproved aluminum branch-circuit wiring lacking the required continuous independent-agency inspection under Section 110.5.1 is a specific, locally-added violation the Building Official checks for separately from the base state code.

Frequently Asked Questions

What electrical code does Westminster use?
Westminster enforces the 2025 Edition of the California Electrical Code, which is based on the 2023 National Electrical Code, under Section 15.12.010 of the Municipal Code. The adopted code governs all wiring, fixture and electrical appliance installation, alteration and repair citywide.
Has Westminster changed anything in the state electrical code?
Yes. Section 15.12.020 adds Section 110.5.1, which allows aluminum wiring only where the Building Official can ensure adequate safety measures, and requires No. 6 gauge or smaller aluminum branch-circuit conductors to get continuous inspection by an independent testing agency for proper torque at their terminations.
Where can I see the adopted electrical code?
A copy of the California Electrical Code as adopted by Section 15.12.010 is kept on file for public examination in the office of the Westminster Building Official, so contractors can review both the state code and the local amendment before pulling a permit.

Sources & Official References

Other rules in Westminster

All Westminster rules

California rules heatmap·Compare Westminster to another location·View the California building safety overview

Get notified when Electrical Permits in Westminster, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in Orange County handle electrical permits.

Santa Ana, CA
Some Restrictions
Irvine, CA
Some Restrictions
Mission Viejo, CA
Some Restrictions
Fullerton, CA
Some Restrictions
Huntington Beach, CA
Some Restrictions
Orange, CA
Some Restrictions
Newport Beach, CA
Some Restrictions
Anaheim, CA
Some Restrictions