Rancho Cucamonga, CA Building Safety: Green Building Code (2026)
Key Facts
- Governing chapter
- RCMC § 17.50 (Implementation of Green Building Code)
- State code adopted
- 2025 California Green Building Standards Code
- Small building exemption
- Under 1,500 sq ft (unless director rules otherwise)
- Municipal project bar
- CalGreen Tier 1 or 100 points, if over 7,500 sq ft
- Adopted
- Ord. No. 1000, 2022
Summary
Rancho Cucamonga layers a local green building implementation ordinance on top of the state CalGreen code, requiring new nonresidential and residential buildings, and substantial renovations, to meet a city-maintained Green Building Compliance Matrix, with priority processing and design-standard reductions for projects that exceed CalGreen tiers.
The purpose of this chapter is to implement the sustainable planning and design provisions of the city general plan... Nonresidential (including mixed-use) development. New buildings, or substantial renovations..., shall comply with all mandatory provisions of the "City of Rancho Cucamonga, Green Building Compliance Matrix (Nonresidential)" as maintained by the planning director and as required by the California CalGreen Building Code.
Full Breakdown
010's adoption of the 2025 California Green Building Standards Code. 020 requires new buildings or substantial renovations, both nonresidential and residential, to comply with all mandatory provisions of the city's Green Building Compliance Matrix for that use type, maintained by the planning director, in addition to CalGreen's own mandatory provisions; compliance is checked during discretionary entitlement review or minor design review. Municipal projects face a higher bar: buildings over 7,500 square feet must implement all CalGreen Tier 1 mandatory provisions or earn 100 points on the optional matrix.
'Substantial renovation' is defined as work covering 35 percent or more of existing floor area, or any addition of new floors, with attached (but not detached) garages counted and increases aggregated over a three-year period. Buildings under 1,500 square feet are exempt unless the planning director determines otherwise, as are major and minor utilities, wireless facilities, construction storage yards, mining and processing, recycling facilities, storage yards, and temporary uses. 030 creates two voluntary incentive tiers: 'RC Green 100' projects hitting CalGreen Tier 1 or 100 matrix points get priority processing, while 'RC Green 200' projects hitting Tier 2 or 200 points get priority processing plus a reduction in one site development standard, such as setback, square footage, or required parking spaces. These provisions were adopted by Ordinance No. 1000 in 2022.
Violations & Fines
Noncompliance with the mandatory Green Building Compliance Matrix provisions is enforced through the discretionary entitlement or design review process; the planning director can withhold approval of a project's compliance matrix showing until mandatory CalGreen and city matrix items are met. Municipal projects over 7,500 square feet that fail to hit Tier 1 or the required 100 optional points are out of compliance with Section 17.50.020(C).
Frequently Asked Questions
Does Rancho Cucamonga require more than CalGreen for new buildings?
Is my small addition exempt from the green building matrix?
What do I get for exceeding CalGreen requirements?
Sources & Official References
Other rules in Rancho Cucamonga
California rules heatmap·Compare Rancho Cucamonga to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Green Building Code in Nearby Cities
How other cities in San Bernardino County handle green building code.