Victorville, CA Building Safety: Green Building Code (2026)
Key Facts
- Diversion requirement
- 65% of C&D debris recycled or salvaged
- Governing section
- Municipal Code Sec. 16-5.11.050(a)
- Land-clearing debris
- 100% of trees/rocks reused or recycled
- Compliance step 1
- Plan filed and approved before permitting
- Compliance step 2
- Plan Summary and receipts before final inspection
Summary
Victorville's Green Building Code amendment requires 65% of nonhazardous construction and demolition debris to be recycled or salvaged on every permitted project: builders must file a Construction Waste Management Plan before permitting and document compliance before final inspection under Sections 16-5.11.030 through .070.
Sections 4.408 and 5.408, Construction Waste Reduction, Disposal and Recycling of the California Green Code are amended as per this Code Section. ... Prior to permitting, documentation shall be provided to the City of Victorville that demonstrates compliance with this Section. The Plan shall indicate the method by which a minimum of sixty-five percent (65%) of the site's nonhazardous construction and demolition debris waste materials shall be recycled and/or salvaged for reuse as well as indicate the manner of disposal for the remaining thirty-five percent (35%) of the construction waste.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 57).
Full Breakdown
Article 11 of the Municipal Code amends Sections 4.408 and 5.408, Construction Waste Reduction, Disposal and Recycling, of the California Green Building Standards Code. Section 16-5.11.030 states that these sections 'are amended as per this Code Section.' The operative numeric standard sits in Section 16-5.11.050(a): prior to permitting, the permittee's Construction Waste Management Plan must indicate the method by which a minimum of sixty-five percent (65%) of the site's nonhazardous construction and demolition debris waste materials shall be recycled and/or salvaged for reuse, with the remaining 35% requiring documented disposal.
Section 16-5.11.040 assesses a fee for the City's plan check and monitoring of that Plan. During construction, Section 16-5.11.060 requires every new subcontractor's foreman to sign an acknowledgment form, requires the jobsite worksheet to be updated per load of diverted material, and mandates that 100% of trees, stumps, rocks and vegetation from excavation and land clearing be reused or recycled; noncompliant documentation triggers a stop-work order under subsection (g). Before final inspection, Section 16-5.11.070 requires the permittee to submit a completed Construction Waste Reduction Management Plan Summary along with disposal or diversion receipts for City approval.
Violations & Fines
Failing to keep the Construction Waste Management Plan documents current and available for the City Inspector triggers a stop-work order under Section 16-5.11.060(g) that stays in effect until the documentation is brought current. A project cannot receive its final inspection without submitting the completed Waste Reduction Management Plan Summary and diversion receipts required by Section 16-5.11.070.
Frequently Asked Questions
What percentage of construction waste must be recycled in Victorville?
When does a Victorville project need to submit its waste plan?
What happens if a contractor doesn't keep waste diversion records on-site?
Sources & Official References
Other rules in Victorville
California rules heatmap·Compare Victorville to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Green Building Code in Nearby Cities
How other cities in San Bernardino County handle green building code.