Conway, AR Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Enforcing office
Fire Marshal's Division, Conway Fire Department
Permit location
Central Fire Station, 1401 Caldwell
Business hours
8:00 a.m. to 4:00 p.m.
Effective date
January 1, 2013 (Ord. No. O-12-78)
Sprinkler hydrostatic test
200 psi for 2 hours, witnessed
Inspection stages before C of O
Six, sprinkler/alarm/hood/final

Summary

In the City of Conway, Arkansas, anyone doing sprinkler, alarm or kitchen-hood suppression work that needs a Fire Marshal inspection for a Certificate of Occupancy must first get a Fire Permit from the Conway Fire Department. Municipal Code Section 2.60.08 lays out six required inspection stages, rough and final sprinkler, rough and final alarm, hood suppression, and final building and site, that must pass before occupancy is granted.

Anyone doing work in the City of Conway that will require a special inspection from the Fire Marshal's Division with the Conway Fire Department for a Certificate to Occupy will be required to have a Fire Permit. This will include but not limited to, Sprinkler, Alarm and Ventilation/ Hood suppression installations. ... Failure to provide this permit prior to inspection will be an automatic rejection of the inspection. ... Inspections that have to be completed prior to Certificate of Occupancy are:a.Rough Fire Sprinkler System Inspection (sprinkler company must set up this appointment).b.Rough Fire Alarm System Inspection (alarm company must set up this appointment).c.Final Fire Sprinkler System Inspection (sprinkler company must set up this appointment).d.Final Fire Alarm System Inspection (alarm company must set up this appointment).e.Kitchen Hood Extinguishing System Inspection (extinguishing company must set up this appointment).f.Final Fire Building and Site Inspection:1.Fire Lane Inspection.2.Gate Inspection.3.Knox Box Inspection.

Full Breakdown

The Fire Permit is obtained in person at the Central Fire Station, 1401 Caldwell, during normal business hours of 8:00 a.m. to 4:00 p.m. The applicant must provide the contractor's name, contact information, license number and proof of insurance, and the permit is valid only for the specific job address being inspected. The requirement, approved by Ordinance No. O-12-78, took effect January 1, 2013. Section 2.60.08 lists the inspections that must be completed before a Certificate of Occupancy is issued: a Rough Fire Sprinkler System Inspection scheduled by the sprinkler contractor, who must verify piping type, hanger spacing, sprinkler clearances and Fire Department Connection placement (within 100 feet of a hydrant, wall-mount FDC between 24 and 48 inches above grade); a Rough Fire Alarm Inspection checking wiring against NFPA 72 and the National Electrical Code, with duct detectors required for units exceeding 2,000 cfm; a Final Fire Sprinkler System Inspection requiring a hydrostatic test of all piping at 200 psi for two hours witnessed by a fire department official, with tenant-improvement work affecting more than 20 sprinklers isolated and retested (20 or fewer is exempt from retesting); a Final Fire Alarm Inspection confirming signals reach the panel, annunciator and the off-site monitoring company and Conway Emergency Operations Center; a Kitchen Hood Extinguishing System Inspection; and a Final Fire Building and Site Inspection covering fire lane marking, gate access controls and Knox Box placement.

Violations & Fines

Failure to produce the Fire Permit before an inspection results in automatic rejection of that inspection under Section 2.60.08, meaning the contractor must reschedule after obtaining the permit. The section further provides that a blatant disregard of the permit requirement will be referred to the City's Code Enforcement Officers, who enforce Conway ordinances generally under Chapter 2.68. The section does not set its own separate dollar fine; rejection of the inspection and Code Enforcement referral are the stated consequences.

Frequently Asked Questions

Do I need a permit before a fire sprinkler inspection in Conway?
Yes. Section 2.60.08 requires a Fire Permit from the Conway Fire Department for any work needing a Fire Marshal inspection, including sprinkler, alarm and hood suppression installations, obtained at the Central Fire Station at 1401 Caldwell.
What happens if the contractor shows up without the Fire Permit?
The inspection is automatically rejected under Section 2.60.08, so the sprinkler, alarm or hood contractor must obtain the permit and reschedule. Repeated or blatant disregard of the permit requirement is referred to the City's Code Enforcement Officers.
What must pass before a Certificate of Occupancy is issued in Conway?
Section 2.60.08 requires rough and final fire sprinkler inspections, rough and final fire alarm inspections, a kitchen hood extinguishing system inspection where applicable, and a final fire building and site inspection covering fire lanes, gates and the Knox Box.
How is the final fire sprinkler inspection tested?
The contractor must hydrostatically test all piping at 200 psi for two hours, witnessed by a fire department official. Tenant-improvement work touching more than 20 sprinklers must be isolated and retested; changes affecting 20 or fewer sprinklers are exempt from retesting.

Sources & Official References

Other rules in Conway

All Conway rules

Compare Conway to another location·View the Arkansas building safety overview

Get notified when Building Inspections in Conway, AR changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.