Garland, TX Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

First inspection
foundation, pool steel, or plumbing rough-in
Second inspection
framing, top-out, electrical rough-in, or duct
Refund before first inspection
75% of permit fee
Refund after final inspection
0%, no refund
Refund request deadline
60 days, written, with receipt
Occupancy hold
blocked until Chapter 31 requirements met

Summary

Garland's building code ties every construction permit to a fixed inspection sequence: foundation or plumbing rough-in first, framing or electrical rough-in second, then a final inspection before occupancy. § 30.301(R) defines those stages to set refund percentages, and § 31.03 blocks final approval until every Chapter 31 requirement is met.

The portion of the fee to be refunded shall be based upon the point to which the work has progressed prior to abandonment or discontinuance, as determined from City inspection records. For the purpose of determining the refundable portion of the fee for combined and individual building permits and for swimming pool permits, the term “first inspection” shall mean any building foundation inspection, pool steel inspection or plumbing rough-in inspection. Similarly, the term “second inspection” shall mean any building framing inspection, plumbing top-out inspection, electrical rough-in inspection or mechanical system duct inspection.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4862189; v40 updated 2026-05-19).

Full Breakdown

301(R)(2) of the Fee Schedule article of the Building Code, the City defines the inspection sequence by name: the "first inspection" is any building foundation inspection, pool steel inspection, or plumbing rough-in inspection, and the "second inspection" is any building framing inspection, plumbing top-out inspection, electrical rough-in inspection, or mechanical system duct inspection. Those definitions control how much of the permit fee is refundable if work is abandoned. 301(R)(1)(a), an owner who abandons a residential, apartment, or commercial building permit before any first inspection gets back 75 percent of the fee; abandoning after the first inspection but before the second recovers 50 percent; abandoning after the second inspection but before the final inspection recovers 25 percent; and once the final inspection has occurred, there is no refund at all.

A refund request must reach the Building Official's office in writing, with the original fee receipt, within 60 days of the date work stopped. 301(R)(2)(c): 75 percent back before any inspection, 50 percent after one inspection by any department, and none after two. 03 stops the City from granting final approval for occupancy on any newly subdivided lot until every requirement of Chapter 31 and the Garland Development Code, including accepted waterworks, sewer, and paving improvements, has been satisfied.

Violations & Fines

Starting work before a required inspection, or skipping straight to occupancy without the final inspection, forfeits the abandonment refund entirely once that final inspection has occurred under § 30.301(R)(1)(a), and § 30.301(S) bars the Building Official from issuing or amending any permit until the required fee is paid. Reinspection fees apply under § 30.301(M) whenever a scheduled inspection fails, and after-hours inspection fees apply under § 30.301(N).

Frequently Asked Questions

What counts as the "first inspection" on a Garland building permit?
Under § 30.301(R)(2), it is any building foundation inspection, pool steel inspection, or plumbing rough-in inspection. The City uses that definition to set how much of the permit fee is refundable if the project is abandoned before that point.
How much of my Garland building permit fee can I get back if I stop the project?
The refund scales with the inspection stage reached under § 30.301(R)(1)(a): 75 percent before any first inspection, 50 percent after the first but before the second, 25 percent after the second but before the final inspection, and nothing once the final inspection has occurred.
Can Garland issue my building permit before I pay the fee?
No. Section 30.301(S) bars the City from issuing any permit required under Chapter 30, Article I, until the prescribed fee has been paid, and it bars approval of any permit amendment until the added fee for that amendment is paid too.
Does passing every building inspection guarantee my new subdivision lot gets final occupancy approval?
No. Section 31.03 also requires every applicable requirement of Chapter 31 and the Garland Development Code, including accepted waterworks, sewer, and paving improvements, to be satisfied before the City grants final approval for occupancy on a newly subdivided parcel.

Sources & Official References

Other rules in Garland

All Garland rules

Texas rules heatmap·Compare Garland to another location·View the Texas building safety overview

Get notified when Building Inspections in Garland, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.