Garland, TX Building Safety: Plumbing Permits (2026)
Key Facts
- Adopted code
- 2015 International Plumbing Code
- Includes appendices
- B, D, and E
- Permit example
- Backflow-assembly installation (§51.78)
- No-permit consequence
- Forced premises containment
- Max fine
- Up to $2,000 per violation
- Filed copy
- City Secretary's office
Summary
Garland has adopted the 2015 International Plumbing Code, including its appendices B, D and E, as the city's Plumbing Code, and separately requires a plumbing permit before backflow-prevention and other regulated plumbing work is installed. Work done to a premises' plumbing system without the required permit can trigger mandatory premises containment under the city's cross-connection rules.
The International Plumbing Code (“Plumbing Code”), 2015 edition, is herewith adopted by reference. A copy of the Plumbing Code shall be kept on file in the office of the City Secretary. Unless deleted, amended, expanded or otherwise changed herein, all provisions of the Plumbing Code shall be fully applicable and binding and of full force and effect within the City. This adoption includes appendices B, D, and E of the Plumbing Code. ... A backflow prevention assembly shall be installed in accordance with current TCEQ rules and this article. The assembly installer shall obtain the required plumbing permits prior to installation and shall have the assembly inspected by the City.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4862189; v40 updated 2026-05-19).
Full Breakdown
80 adopts the International Plumbing Code, 2015 edition, by reference as Garland's Plumbing Code, with a copy kept on file in the City Secretary's office; unless a section is deleted, amended, or expanded elsewhere in Chapter 30, the 2015 IPC text controls, and the adoption specifically includes IPC appendices B, D and E. 81 authorizes the city to amend, modify or delete specific IPC sections, with those local changes attached to the chapter. 78(1) requires that a backflow-prevention assembly installer 'obtain the required plumbing permits prior to installation and shall have the assembly inspected by the City,' tying the general plumbing permit duty to a specific, common piece of plumbing work.
61(E) backs that up from the enforcement side: if a City inspector finds that additions or rearrangements have been made to a premises' plumbing system 'without the proper permits as required by the Plumbing Code,' the City can require premises containment, a backflow-prevention device at the water service connection itself, rather than relying on internal isolation. That is a real consequence for skipping a plumbing permit: it can force a property to add equipment at the meter that would not otherwise be required.
Violations & Fines
Plumbing work performed without the permit the Plumbing Code requires exposes the property to the premises-containment order under section 51.61(E), on top of the standard Chapter 30 penalty: a misdemeanor punishable under the general penalty of section 10.05, up to $2,000 for fire-safety or public-health-related violations and up to $500 for other Code violations, with each day of unpermitted work or noncompliance treated as a separate offense.
Frequently Asked Questions
What plumbing code does Garland use?
Do I need a permit to install a backflow prevention device?
What happens if I do plumbing work without a permit?
Sources & Official References
Other rules in Garland
Texas rules heatmap·Compare Garland to another location·View the Texas building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Plumbing Permits in Nearby Cities
How other cities in Dallas County handle plumbing permits.