Philadelphia, PA Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Phila. Code § A-402 (Permit Inspections)
Notice of start window
24 hours to 14 days before work
Demolition initial inspection
At least 48 hours before start
Concealment rule
No covering work until stage is approved
Missed final inspection
Permit becomes invalid, violations issued
Entry authority
Home Rule Charter § 5-1004

Summary

Philadelphia's Department of Licenses and Inspections runs permit work through staged inspections under Code Sec. A-402: preliminary, required stage inspections tied to each trade, and a final inspection before a certificate of occupancy issues. Work cannot be concealed until the code official signs off on that stage.

A-402.5 Final inspection: Upon completion of the work authorized by the permit and before issuance of the certificate of occupancy or final approval, a final inspection shall be made. All violations of the permit and approved construction documents shall be noted and the holder of the permit shall be notified of the violations. ... Where the permit holder does not provide for a final inspection, the permit shall become invalid and appropriate code violations shall be issued. A-402.9 Approval required: Work shall not be done nor concealed beyond the point indicated in each successive inspection without first obtaining the approval of the code official. The code official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or shall notify the permit holder or an agent of the permit holder wherein the same fails to comply with the code. Any portions that do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the code official.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 Code: Electronic version of The Philadelphia Code and Home Rule Charter is current through August 19, 2026).

Full Breakdown

Section A-402 of the Philadelphia Building Construction and Occupancy Code sets the inspection sequence for every permit. Before a permit issues, the code official may run a preliminary inspection of the building, structure or site (A-402.2). Once work starts, A-402.9 bars covering or concealing any work "beyond the point indicated in each successive inspection without first obtaining the approval of the code official"; the inspector either signs off on the completed portion or tells the permit holder where it fails to comply, and noncompliant work "shall not be covered or concealed until authorized by the code official." The permit holder must give notice of the start of work not less than 24 hours and not more than 14 calendar days before beginning permitted work (A-402.8.1); if work does not start within 14 days of that notice, the holder must report the delay and give an updated start date.

Required inspections are broken out by permit type in A-402.10: building permits cover footing/foundation, concrete slab or under-floor, lowest floor elevation in flood hazard areas, framing, wallboard, fire-resistant penetrations, energy efficiency and accessibility (A-402.10.1.1 through .1.9); plumbing, fuel gas/mechanical and electrical permits each require underground, rough-in and final stages (A-402.10.2 through .10.4); residential permits require foundation, rough system, floodplain, and frame/masonry inspections (A-402.10.5); demolition permits require an initial site-safety inspection at least 48 hours before work begins, a progression inspection per floor, an adjacent-wall inspection, a pre-final inspection and a final inspection (A-402.10.6.1 through .10.6.5); fire suppression permits require underground, rough-in and final stages plus documentation of final testing (A-402.10.7).

At the close of the job, A-402.5 requires a final inspection before a certificate of occupancy or final approval issues, performed by persons certified under Commonwealth of Pennsylvania regulations for the applicable trade; any noted violations trigger a re-inspection to confirm the fix before the certificate is issued, and if the permit holder never requests the final inspection, "the permit shall become invalid and appropriate code violations shall be issued." Under A-401.1, the code official may enter, at any reasonable time, any structure or premises for which a permit was issued to check compliance with the permit and the code, citing Home Rule Charter Sec. 5-1004 as the entry authority.

Violations & Fines

Concealing or covering work before the required stage inspection is approved is itself a code violation under A-402.9, separate from any defect found once the work is opened up. If the permit holder never calls for the final inspection required by A-402.5, the permit lapses automatically and L&I issues the appropriate code violations for work performed without a valid permit. On demolition sites, A-402.10.6.1 lets the Department issue a Stop Work order if pedestrian protection is not in place before demolition starts, and that order stays in effect until the protection is installed, inspected and approved by a code official.

Frequently Asked Questions

When do I have to call for a final inspection in Philadelphia?
Before the certificate of occupancy or final approval issues, under Code § A-402.5. If you never request it, your permit becomes invalid under the same section and L&I will issue code violations for work performed without a valid permit, even if the underlying construction was done correctly.
How much notice does Philadelphia require before starting permitted work?
Under § A-402.8.1, the permit holder or their designee must notify the code official or inspection agency not less than 24 hours and not more than 14 calendar days before starting work authorized by the permit. If work has not started within those 14 days, you must report the delay and give an updated start date.
Can I cover up framing or plumbing before it's inspected?
No. Section A-402.9 requires that work not be concealed "beyond the point indicated in each successive inspection" until the code official approves it. Any portion that fails to comply must be corrected and stays exposed until the code official authorizes covering it.
What inspections does a demolition permit require in Philadelphia?
Under § A-402.10.6, demolition requires an initial site-safety inspection at least 48 hours before work starts, a per-floor progression inspection, an adjacent-wall inspection before backfilling, a pre-final inspection confirming improper fill was removed, and a final inspection confirming compliance and site grading.

Sources & Official References

Other rules in Philadelphia

All Philadelphia rules

Compare Philadelphia to another location·View the Pennsylvania building safety overview

Get notified when Building Inspections in Philadelphia, PA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.