Plano, TX Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Enforcing dept.
Building Inspections Department (§103.1)
Re-inspection triggers
7 listed conditions, Sec. 109.7
Unpermitted work
special investigation required, Sec. 109.8
Investigation fee
equals normal permit fee, Sec. 109.9
Concealed-work fee
unauthorized cover-up fee, Sec. 109.10
Base code
2024 International Building Code

Summary

Plano's Building Inspections Department, created under Sec. 103.1 of the amended International Building Code, runs every construction inspection in the city. Inspectors can charge a re-inspection fee when a job isn't ready, and unpermitted work triggers a mandatory investigation and an added investigation fee before any permit issues.

Sec. 103.1 Creation of enforcement agency. The Building Inspections Department ("agency") is hereby created and the official in charge thereof shall be known as the building official. The function of the agency shall be the implementation, administration and enforcement of the provisions of the code. ... Sec. 109.7 Re-inspection fee. A fee, as established by city council resolution, may be charged when: 1.The inspection called for is not ready when the inspector arrives.2.No building address or permit card is clearly posted....5.The job site is red-tagged twice for the same item.6.The original red tag has been removed from the job site.7.There is a failure to maintain erosion control, trash control, or tree protection. Any re-inspection fees assessed shall be paid before any more inspections are made on that job site. Sec. 109.8 Work without a permit; Investigation. Whenever work for which a permit is required by this code has been commenced without first obtaining a permit, a special investigation shall be made before a permit may be issued for such work.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 153).

Full Breakdown

Sec. 6-37 amends Section 103 of the adopted 2024 International Building Code and creates 'SECTION 103 BUILDING INSPECTIONS DEPARTMENT,' with Sec. ' The same section adds Sec. 10 to govern the inspection process itself. Sec. 7 lets the city charge a re-inspection fee, set by council resolution, in seven listed circumstances including when 'the inspection called for is not ready when the inspector arrives,' when 'no building address or permit card is clearly posted,' when the site is locked or work is unavailable, when a site is 'red-tagged twice for the same item,' or when there is 'a failure to maintain erosion control, trash control, or tree protection'; any assessed re-inspection fee must be paid before further inspections proceed.

Sec. 8 requires 'a special investigation' whenever work needing a permit 'has been commenced without first obtaining a permit,' before a permit can later be issued for that work, and Sec. 9 adds an investigation fee equal to the normal permit fee, collected whether or not a permit is ultimately issued. Sec. 10 layers on an 'unauthorized cover up fee,' set by the city fee schedule, for work concealed without the inspection Section 110 requires. Sec. 1 separately conditions an active building permit on keeping at least one toilet facility on site, backed by the threat of a stop work order.

Violations & Fines

Sec. 6-16 makes any violation of the building code article a misdemeanor punishable under the citywide fine schedule in Sec. 1-4(a), with each day of continued violation a separate offense. Concealing work before the required inspection under Section 110 triggers the Sec. 109.10 unauthorized cover-up fee on top of any misdemeanor fine, and repeated failed re-inspections leave re-inspection fees owed, which must be cleared before any further inspection is scheduled.

Frequently Asked Questions

Who runs building inspections in Plano?
The Building Inspections Department, created by Sec. 103.1 of the amended International Building Code, with the department head titled the building official. That office implements, administers, and enforces the building code across every permitted project in the city.
Why would Plano charge me a re-inspection fee?
Sec. 109.7 lists seven triggers, including the inspector arriving to a job that isn't ready, no address or permit card posted, the site being locked, and a job site red-tagged twice for the same item. Any fee assessed must be paid before another inspection is scheduled.
What happens if I build without a Plano permit first?
Sec. 109.8 requires the building official to conduct a special investigation before a permit can be issued for work already started without one. Sec. 109.9 then adds an investigation fee equal to the normal permit fee, charged whether or not a permit is ultimately granted.
Can Plano fine me for covering up work before inspection?
Yes. Sec. 109.10 imposes an unauthorized cover-up fee, set by the city fee schedule, on any work concealed without first obtaining the inspection Section 110 requires: on top of the general misdemeanor penalty in Sec. 6-16.

Sources & Official References

Other rules in Plano

All Plano rules

Texas rules heatmap·Compare Plano to another location·View the Texas building safety overview

Get notified when Building Inspections in Plano, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Inspections in Nearby Cities

How other cities in Collin County handle building inspections.

Frisco, TX
Some Restrictions